Standard contract provisions roads vol 2 roadworks performance contract
The roadworks performance contract (RPC) is the basis for undertaking road infrastructure works on a sole invitee basis with Local Government or RoadTek.
The RPC manual consists of a manual and the required documents and forms necessary to prepare a contract. The manual provides guidance on when to use the RPC form of contract for Main Roads works and the processes to be used in preparing documents and reaching agreements. The department obtains best practice from its contract system when all sections are used as intended.
Forms are supplied as an Adobe Acrobat PDF and Microsoft Word format. The Acobat PDF version may be printed as a master reference, while the MS Word version may be down loaded and filled in electronically.
To use a form without a link please use the RCC version found in Volume 1.
-
Table of contents (PDF, 30 KB)
-
Amendment list (PDF, 23 KB)
-
Cover 1 (DOC, 39 KB)
-
Cover 2 (DOC, 43 KB)
-
Interleaves (DOC, 44 KB)
-
Manual (PDF, 30 KB)
- Part 1: invitation for offer
Invitation for offer (C6011) (DOC, 99 KB)
- Part 2: general conditions of offer
General conditions of offer (6014) (PDF, 35 KB)
- Part 3: offer forms
Offer (6012) (DOC, 127 KB)
Schedule summary (C6810.M1.A)
Schedule of rates (C6810.M1.B)
Planned cash flow schedule (C6810.M3)
- Tender program (C6810.M4)
-
Daywork schedule (C6043A) (DOC, 89 KB)
Daywork schedule (C6043B) (DOC, 110 KB)
- Part 4: general conditions of contract and annexure
General conditions of contract (C6830.RPC) (PDF, 200 KB)
General conditions of contract: annexure part A (C6832.RPC) (DOC, 163 KB)
- Part 5: supplementary conditions of contract and expert determination agreement
Supplementary conditions of contract (C6838.RPC) (PDF, 137 KB)
Supplementary conditions of contract: annexure (C6839.RPC) (DOC, 557 KB)
Expert determination agreement (C6030) (DOC, 114 KB)
- Part 6: standard document
Standard document list (C6825)
- Part 7: project specific documents
Drawings list (C6826)
- Principal supplied material list (C6827)
Precast pipes and box culverts summary (C6828)
- Part 8: other documents
10% training policy compliance plan (C6852.1)
10% training policy interim compliance report (C6852.2)
10% training policy practical completion report (C6852.3)
Guide to completing 10% training policy practical completion report (C6852.4)
Workplace Health and Safety Act 1995: notice of appointment of principal contractor (C6853)
Last updated: 23 February 2012