In July 2011, the Department of Transport and Main Roads commenced resurfacing and rehabilitation works which was completed on 21 December 2011. The end result is improved driving conditions as well as increased safety for motorists.
An innovative planning tool to measure ease of access to common destinations by walking and/or public transport.
A study to improve the efficiency, service frequency, operating speeds and reliability of trains, and cater for the increasing demand for rail services in the corridor associated with population and freight transport growth.
Safety improvement works at the intersection of Latrobe Terrace and Macgregor Terrace, Bardon.
Upgrade and realign a 13km section of the Leichhardt Highway at Rannes.
Rehabilitation works will be carried out underneath the overpass bridge, on the Pacific Motorway off-ramp to Vulture Street.
The Logan Motorway Corridor Strategy is a long term plan to address the area’s future growth in industrial, commercial and residential development.
Last reviewed: 22 August 2011