Samford Road and Wardell Street Intersection Upgrade Project
Project info
Preferred plan released:
The preferred plan retains most of the features of the original concept plan. Some of the key features are:
- Additional and longer right turn lanes on Samford Road meaning more traffic can travel through the intersection in a shorter time period, allowing more signal green time on Wardell Street.
- Reduced congestion with the average delay per vehicle at the intersection decreasing by up to 70% in peak periods.
- A more efficient intersection to reduce the attractiveness of rat-running through local streets.
- Improved safety through better road geometry, cycle lanes, wider footpaths and a smoother road surface.
- Allows for the future provision of an access into the Enoggera Army Base at Imbros Street.
Samford Road and Wardell Street intersection upgrade: Newsletter 2 (February 2012) (PDF, 744 KB).
Changes in the preferred plan:
The main changes in the preferred plan compared to the concept plan are:
- On Samford Road, pedestrian and cycle safety has been increased by providing on-road cycle lanes and wider footpaths.
- A proposed right turn ban for northbound Wardell Street traffic into Samford Road eastbound will not be implemented as it may have encouraged rat-run movements.
- A U-Turn facility at Imbros Street will provide better access for local residents whilst maintaining the safety benefits of the median islands.
- The proposed left turn lane on Samford Road westbound has been removed as it provided minimal benefits.
Interim works
Interim works were completed in January 2012 and included extending the northbound, left turn lane from Wardell Street into Samford Road. This allows more than ten extra cars to wait in the turning lane, therefore letting more cars travelling ‘straight ahead’ to flow through the intersection, rather than waiting behind cars wishing to turn left.
Upgrade project contact details
| Email: |
samford.wardell@tmr.qld.gov.au |
| Phone: |
1800 045 348 – Monday to Friday 8.30 am to 5 pm (free from anywhere in Australia, call charges may apply for calls from mobile phones and payphones) |
| Post: |
Samford Road and Wardell Street intersection project Department of Transport and Main Roads PO Box 70 Spring Hill QLD 4001 |
|---|
Latest news
The Department of Transport and Main Roads has finalised the preferred plan for the Samford Road and Wardell Street Intersection upgrade. Since the release of the draft concept plan (July 2011), the department has refined this plan using feedback from the community, stakeholders and outputs from further technical investigations.
Please direct all enquires regarding the Samford Road and Wardell Street Intersection Upgrade to samford.wardell@tmr.qld.gov.au, or call the project phone line on 1800 045 348.
Last updated: 30 April 2012