Overview:

Design work to improve pedestrian movements and traffic flow along Morayfield Road between Lindsay Road and Oakey Flat Road intersections in Caboolture is now complete.

Location:

Intersection treatments along Morayfield Road between Lindsay Road and Oakey Flat Road.

Completion:

Detailed design was completed in late 2018.

Construction anticipated to commenced in mid-2019.

Benefits:

The project will improve road safety and pedestrian movements by implementing high-benefit, cost-effective intersection safety treatments, which will address known and potential crash locations on Morayfield Road between Lindsay Road and Oakey Flat Road intersections.

Funding:

This project is being delivered as part of the $28.8 Morayfield Road and Beerburrum Road Route Safety Package, delivered as part of the Queensland Government’s Targeted Road Safety Initiatives Program.

Regions:
North Coast Region

Project info

The Department of Transport and Main Roads has completed design work to improve motorist and pedestrian safety on the section of Morayfield Road between Lindsay Road and Oakey Flat Road intersections.

As part of the Morayfield Road and Beerburrum Road Route Safety project, a number of safety improvement treatments will be implemented to create safer and more efficient intersections for pedestrians and motorists, improve traffic flow and ease congestion on Morayfield Road as well as provide increased storage for right-turn queues at intersections where current storage capacity is limited.  The below safety improvements will be implemented at the following locations.

Morayfield Mega Centre / Lindsay Road intersection

  • Installing a new pedestrian crossing on Lindsay Road (northern side) and at the Morayfield Mega Centre access to connect with existing footpaths.
  • Realigning the left-turn slip lane into the Morayfield Mega Centre to improve visibility.

Supercentre Complex intersection

  • Modifying the existing traffic signal phasing to allow fully-controlled right-turn movements into the Super Centre and Homemaker Centre complexes from Morayfield Road.
  • Extending the northbound right-turn lane to provide additional storage capacity for motorists’ turning into the Homestyle Homemaker Centre.
  • Providing 4 zebra pedestrian crossings, one on each leg of the intersection.
  • Install tactile guidance markers to assist visually impaired pedestrians at all pram ramps and signalised crossings.

Gaffield Street intersection

  • Providing new pedestrian footpaths on the eastern side (Cul-de-sac side) of Morayfield Road, to connect to the existing footpath.
  • Upgrading traffic signals to include new signalised pedestrian crossing on Gaffield Street (East).

Walkers Road intersection

  • Extending the dual right-turn lanes on Morayfield Road to provide increased storage capacity for vehicles turning into Walkers Road. 
  • Removing the U-turn facility on Morayfield Road at the Walkers Road intersection to improve intersection efficiency, increase safety and limit delays for pedestrians crossing Morayfield Road. The U-turn facility will remain in place at the Gaffield Street intersection.
  • Extending the right-turn lane on Walkers Road to provide increased storage capacity for vehicles turning into Morayfield Road.
  • Installing new staged pedestrian crossing on Morayfield road (northern side) to improve pedestrian safety. 
  • Relocating the pedestrian crossing on the left turn slip from Walkers Road to Morayfield Road (northern side).
  • Installing new pedestrian crossing on the left turn slip from Morayfield Road to Walkers Road (southern side).

Oakey Flat Road into Station Road

  • Signalising Oakey Flat Road intersection with Morayfield Road.
  • Providing a signalised pedestrian crossing on Oakey Flat Road.
  • Installing a new cycle lane on the western side of Morayfield Road across the intersection.
  • Extend western side footpath to provide connectivity to the signalised pedestrian crossing on Oakey Flat Road.

Overarching layout detailing the works

Design was complete in late 2018 and construction is anticipated to commence in mid-2019. The project team will be in contact with nearby businesses and surrounding stakeholders to provide more details prior to construction commencing.

Contact details

Email: MBRRSP@tmr.qld.gov.au
Phone: 07 5451 7055 / 1800 289 698
Post: Morayfield Road and Beerburrum Road Route Safety
Department of Transport and Main Roads
PO Box 1600
Maroochydore Qld 4558
Last updated
02 April 2019