Road Asset Management Contract and Responsive Maintenance Contract—South Coast

We are delivering continual maintenance and rehabilitation of state-controlled roads and assets in the South Coast region.

We are managing the following types of maintenance activities that are covered under the Road Asset Management Contracts: 

  • Road resurfacing, asphalt overlays and minor works 
  • Bitumen reseals 
  • Roadside signage and road furniture maintenance 
  • Pothole and road pavements repairs 
  • Minor drainage and culvert maintenance. 

It is important to note that, to ensure the best value for the community, the department prioritises maintenance work with safety issues given the highest priority and regular maintenance activities such as litter and graffiti removal, mowing and vegetation clearing, given a lower priority. 

Pothole repairs 

Our maintenance contractors regularly patrol roads to identify any potholes and undertake repairs as necessary. Pothole repairs are based on a safety priority, with consideration given to the location of the potholes within traffic lanes and traffic volumes. Usually the largest potholes under heaviest traffic are repaired first.  

Extended rain means potholing is sometimes unavoidable and, after a rain event it can take time for the road to recover from saturation point. Temporary pothole repairs are usually carried out using a cold 'pre-mix' material. A permanent repair involves excavating the pothole and filling it with a hot 'asphalt' mix, which requires the road surface and sub-surface to be completely dry and the fill must be laid in fine weather. 

To report a pothole, email: southcoast@tmr.qld.gov.au  or call 131940 (available 24/7) and provide details of the location.  

Road surface treatments (asphalt overlays, reseals and rehabilitation)

Even with specialised design and construction systems to ensure longevity of the road network, there are some instances where sections of road surfaces can suffer deterioration. In this situation, the department carries out road rehabilitation works. These works are also prioritised based on safety and traffic volumes. Work is scheduled once funding becomes available. 

Road pre-treatment works 

When road resurfacing and reseals are planned there is often a need to carry out pre-treatment works to prepare the road for new surfacing. These pre-treatment works include patching potholes, repairing cracks, and smoothing road shoulders and road edges. 

Benefits

  • Improves safety
  • Improves flood immunity
  • Better road access
  • Contributes to regional growth
  • Improves ride quality

Key features

  • Road resurfacing, asphalt overlays and minor works 
  • Bitumen reseals 
  • Roadside signage and road furniture maintenance 
  • Pothole and road pavements repairs 
  • Minor drainage and culvert maintenance. 

Funding

It is estimated that about $99 million of works will be delivered throughout South Coast region.

Total investment
$99 million

Current status

A new generation 2, Road Asset Management Contract (RAMC) came into effect on 1 July 2019. 

Motorists will be informed about the above works via roadside signage. Traffic alert emails are also available for anyone wishing to receive them. Sign up by sending an email to southcoast@tmr.qld.gov.au 

Residents within the immediate vicinity of road surface treatment works can expect to be informed via a letterbox drop. 

For information on the latest traffic conditions, please contact the Statewide Traffic Management Centre on 13 19 40 or visit the QLDTraffic website.