![Pioneer-River-crossing-works Mackay Ring Road Pioneer River construction Mackay Ring Road](/_/media/d61541464bb2470eb48d3ebc045a18fe.jpg?h=399&iar=0&w=600&rev=6ea022b958344e189155c884e2a99617&extension=jpg&size=101083&hash=7046E43FB3F0ECC9999550EE9F6D975E)
Mackay Ring Road
An improved link has been delivered from the south to the northern suburbs reducing traffic through Mackay.
Construction![Coomera Connector resized Artist's impression of a road crossing a river](/_/media/865061055fe3495c8bf37f43230098be.jpg?h=507&iar=0&w=1000&rev=86292a4353754223925d73298b5c79cd&extension=jpg&size=233337&hash=DF2249430EBFB7B3869AB95CF9608040)
Coomera Connector (Stage 1), Coomera to Nerang
The Stage 1 section of the Coomera Connector between Coomera and Nerang is around 16km and has been identified as the priority section to be built first.
Construction![John Davies Bridge, Bruce Highway, between Edmonton to Gordonvale](/_/media/79639be2fba44e1798c87f64fe507658.jpg?h=600&iar=0&w=1170&rev=f24bdaa04d9845ca90f32c4861e8ada2&sc_lang=en&extension=jpg&size=281130&hash=2A3A4E4F6490C78D083D4A793D98A516)
Bruce Highway, Cairns Southern Access Corridor (Stage 3), Edmonton to Gordonvale
A total transport solution has been delivered to provide long-term improvements to traffic flow and road safety through reducing congestion, highway travel time and improving road access.
Completed![Tram with Burleigh destination Gold Coast Light Rail Tram with 'Burleigh' destination](/_/media/3ffb475964994201b2af4964589fbc1b.jpg?h=3864&iar=0&w=5152&rev=cf65b658ee5c4187a41f6cd95a3aa4c1&extension=jpg&size=4605851&hash=C10C97450A69E11B19A48781DF8C8945)
Gold Coast Light Rail (Stage 3) Broadbeach South to Burleigh Heads, construct light rail
Gold Coast Light Rail is a world class public transport system for residents and visitors to the Gold Coast.
ConstructionInvestments in Queensland
Pick a district to see how we’re investing there