Mount Lindesay Highway (Brisbane – Beaudesert), Stoney Camp Road to Chambers Flat Road, construct additional lanes
The section of the Mount Lindesay Highway between Stoney Camp Road and Chambers Flat Road at Munruben, which is part of the Mount Lindesay Highway Upgrade Program, is being upgraded.
Construction
Bruce Highway, Cairns Southern Access Corridor (Stage 3), Edmonton to Gordonvale, construction
A total transport solution is being undertaken to provide long-term improvements to traffic flow and road safety through reducing congestion, highway travel time and improving road access.

Bruce Highway (Brisbane - Gympie), Caloundra Road to Sunshine Motorway, upgrade
Major construction is complete on the Bruce Highway – Caloundra Road to Sunshine Motorway project. The highway has been upgraded to 6 lanes between Caloundra Road and the Sunshine Motorway. This includes major upgrades to both interchanges and a new 2-way service road for local traffic between Steve Irwin Way and Tanawha Tourist Drive.
Completed
Rockhampton Ring Road plan, preserve and construct
The Rockhampton Ring Road plan, preserve and construct project (Rockhampton Ring Road project) will improve road safety and strengthen the region’s economy by improving freight efficiency, flood resilience and job opportunities. The alignment will support connectivity between key employment, leisure, tourism and residential growth areas of Rockhampton and the wider region.
Detailed design
Coomera Connector (Stage 1)
The Stage 1 section of the Coomera Connector between Coomera and Nerang has been identified as the priority section to be built first.
Pre-constructionInvestments in Queensland