Showing results 1-10 of 30

Sort results
Sort results
  1. Proserpine - Shute Harbour Road, Paluma Road to Tropic Road (Cannonvale), duplication

    This upgrade will improve safety and increase capacity along a 1.5-km section of Proserpine - Shute Harbour Road by widening from 2 to 4 lanes, upgrading key intersections, and installing a new shared...

    No image supplied
  2. Booral Road and Boundary Road (Urangan), intersection upgrade

    Detailed design is underway for a proposed upgrade of the Booral Road and Boundary Road intersection...

    The map shows the locality of the proposed Booral Road and Boundary Road intersection upgrade. Hervey Bay is located north-east of the project location. A solid blue line indicates the project extent, which encompasses the Booral Road and Boundary Road intersection, and also extends along Booral Road to the north past the Emerald Park Way intersection and to the south along Booral Road past the proposed new Walkers Road intersection. Walkers Road has been realigned to access Booral Road to the south of the Booral Road and Boundary Road intersection. The local road network, including where Booral Road turns into Elizabeth Street, is also highlighted on the map.
  3. Boundary Road (Coopers Plains), rail level crossing, funding commitment

    We are completing a business case to investigate options to reduce congestion and address safety concerns at Boundary Road, Coopers Plains rail level crossing...

    Boundary Road Coopers Plains Rail Crossing map
  4. Proserpine – Shute Harbour Road, Hamilton Plains, flood immunity upgrade

    Proserpine – Shute Harbour Road will benefit from a $21 million flood immunity upgrade at Hamilton Plains between the Bruce Highway turn-off and Strathdickie Road...

  5. Coomera Connector Stage 1 South

    Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 South, currently in the design phase, is the section from Smith Street Motorway to Nerang-...

    No image supplied
  6. David Low Way cycle facility

    On-road bicycle lanes are being constructed to improve safety at Marcoola and Mudjimba...

    No image supplied
  7. Sunshine Motorway, Mooloolah River Interchange Upgrade (Stage 1)

    The Sunshine Motorway, Mooloolah River Interchange Upgrade will deliver a safe, efficient, and effective transport network to meet the current and future transport needs of the Sunshine Coast...

  8. Gaythorne train station park 'n' ride, design and land acquisition

    Detailed design has started for future expansion of parking facilities at Gaythorne station...

    Thumbnail of map showing the proposed expansion of parking facilities at Gaythorne train station park 'n' ride
  9. Gympie – Brooloo Road, design active transport crossings

    Detailed design is underway for active transport bridge structures and pathway to provide connectivity of the Principal Cycle Network from Gympie's southside into the Gympie CBD and surrounds...

    No image supplied
  10. Coomera Connector Stage 1 Central

    Coomera Connector (Stage 1) is around 16km long and will be delivered in 3 construction packages. Stage 1 Central, which is currently in the design phase, is the 8km section from Helensvale Road to...

    No image supplied
Previous Page (disabled)
  1. Page 1
  2. Page 2
  3. Page 3