  1. Bruce Highway (Innisfail – Cairns) and Munro street (Babinda) intersection upgrade

    We are progressing a project to upgrade the intersection of the Bruce Highway and Munro Street at Babinda...

    No image supplied
  2. Richmond - Winton Road, strengthen and widen pavement

    The department will improve all weather access, travel reliability and safety along the Richmond – Winton Road by widening and strengthening this section of the road...

    No image supplied
  3. Gillies Range Road, various locations, improve safety

    The department is delivering an $19.341 million program of upgrades on 4 sections of Gillies Range Road between Gordonvale and Atherton to enhance safety...

    The starting point of the road is the township of Gordonvale in the north, continuing to the township of Yungaburra, located two-thirds of way along the route, to the end destination of the township of Atherton in the south. Near Yungaburra, there are safety improvement works in progress for the final segment of the Gillies Range Road with additional directional signage pointing to Cairns and Mareeba.
  4. Cairns Southern Access Cycleway, construct cycleway

    We are reinvesting project savings to deliver a new off-road cycleway adjacent to the Bruce Highway consistent with the Cairns Bruce Highway Upgrade Masterplan...

    Cairns Southern Access Cycleway
  5. Townsville Northern Access Intersections Upgrade (Bruce Highway, Veales Road to Pope Road)

    The Townsville Northern Access Intersections Upgrade project will improve road safety, efficiency and travel time reliability for freight and passenger vehicles on the Bruce Highway in Townsville...

    No image supplied
  6. Cairns Bruce Highway Upgrade master plan

    The Cairns Bruce Highway Upgrade master plan was released in 2010. It was the result of a planning study that investigated long term, multi-modal transport planning options to address the impacts of...

    No image supplied
  7. Townsville Connection Road (Idalia), University Road to Bowen Road Bridge, improve safety

    We are upgrading Townsville Connection Road to dual lanes between University Road and Bowen Road Bridge...

    No image supplied
  8. Yorkeys Knob—boat ramp

    We are constructing a new recreational boat launching facility at Yorkeys Knob...

    No image supplied
  9. Cape York Region Package Stage 2

    Cape York Regional Package Stage 2 is a $237.5 million program of works to deliver road infrastructure upgrades on Cape York Peninsula between 2019-2020 and 2023-2024...

    No image supplied
Previous Page (disabled)