Showing results 1-10 of 27

Sort results
Sort results
  1. Garbutt - Upper Ross Road (Riverway Drive) (Stage 2), Allambie Lane to Dunlop Street, duplicate to four lanes

    The Riverway Drive Stage 2 project will improve the safety, capacity and efficiency of Riverway Drive between Allambie Lane and Dunlop Street in Kelso, Townsville...

    No image supplied
  2. Bruce Highway, (Ingham – Innisfail) Ingham to Cardwell Range Deviation, plan and preserve corridor

    The department has been actively working with the community to address the challenges associated with the Bruce Highway from South of Ingham to the Cardwell Range...

    The map shows the locality of the existing Bruce Highway, from south of Ingham, north through the Gairloch floodway and up to the Cardwell Range. Cardwell is northeast of the map. A solid dark blue line west of the Bruce Highway indicates the current proposed Ingham to Cardwell deviation project corridor. This is known as the Western 2A Deviation, which has been gazetted as future state-controlled road. The local road network, including Halifax Road and Lannercost Street are also highlighted on the map.
  3. Townsville Ring Road (Stage 5)

    Construction started in June 2021 and was completed in early October 2023...

    Hervey Range Developmental Road interchange (looking north), photo shows two overpasses and traffic traveling across the overpasses and underneath
  4. High Risk Roads projects (Townsville)

    The Department of Transport and Main Roads (TMR) is undertaking safety improvement works at various locations across three state-controlled roads in Townsville: South Townsville Road – from the...

    No image supplied
  5. Bruce Highway (Ingham – Innisfail), Gairloch Floodway, improve safety

    Planning has commenced to improve safety and reduce the time of closure due to flooding on a complex section of the Bruce Highway at the Gairloch floodway, 5km north of Ingham...

    Gairloch floodway on the Bruce Highway north of Ingham
  6. Townsville Eastern Access Rail corridor

    The Townsville Eastern Access Rail Corridor (TEARC) project is a proposed 8.3km rail freight line connecting the North Coast rail line directly into the Port of Townsville...

    Townsville Eastern Access Rail Corridor
  7. South Townsville Road (Stage 1), various locations, improve intersections

    We are currently undertaking safety improvement works at various locations along South Townsville Road...

    South Townsville Road Stage 1 various locations improve intersections
  8. Bruce Highway roadworks and traffic impacts (Home Hill–Ingham) 

    The department is undertaking several Bruce Highway safety and flood immunity projects between Home Hill and Ingham. We recommend allowing an extra 10 minutes of travel time near these road work...

  9. Bruce Highway (Bowen-Ayr), Inkerman overtaking lane and safety improvement projects

    Construction of a new northbound overtaking lane on the Bruce Highway at Fredericksfield and upgrades to the intersection with Mount Inkerman Road...

    No image supplied
  10. Townsville Connection Road (Stuart Drive), Bowen Road Bridge (Idalia), duplicate bridge and approaches

    A new upstream bridge will be constructed over Ross River in Townsville adjacent to the existing Bowen Road Bridge...

    No image supplied
Previous Page (disabled)
  1. Page 1
  2. Page 2
  3. Page 3