  1. Burdekin River Bridge, rehabilitation program

    Rehabilitation and maintenance program to preserve the structural integrity of the Burdekin River Bridge. The ongoing program will ensure a safe and durable crossing is maintained for the long-term...

    Burdekin River Bridge
  2. Aramac – Torrens Creek Road, improvement works

    Construction started early 2021 and will be complete mid-2022, construction and weather conditions permitting...

    No image supplied
  3. Boogan Road, widen and strengthen pavement

    The upgrade will include the widening of the existing road...

    No image supplied
  4. Bruce Highway (Ayr - Townsville), Killymoon Creek to Townsville Port Road, improve intersection

    The upgrades to the Bruce Highway intersections at Allendale Drive, Three Sisters Drive, and Muntalunga Drive have successfully been completed...

  5. Bruce Highway (Bowen-Ayr), Inkerman overtaking lane and safety improvement projects

    Construction of a new northbound overtaking lane on the Bruce Highway at Fredericksfield and upgrades to the intersection with Mount Inkerman Road...

    No image supplied
  6. Bruce Highway (Ingham – Innisfail), Gairloch Floodway, improve safety

    Planning has commenced to improve safety and reduce the time of closure due to flooding on a complex section of the Bruce Highway at the Gairloch floodway, 5km north of Ingham...

    Gairloch floodway on the Bruce Highway north of Ingham
  7. Bruce Highway (Ingham – Innisfail), Smiths Gap, construct southbound overtaking lane and fauna overpass

    The Department of Transport and Main Roads is progressing a project to build a southbound overtaking lane at Smiths Gap on the Bruce Highway. The project will include the construction of a fauna...

    No image supplied
  8. Bruce Highway (Innisfail - Cairns), Innisfail Bypass, plan and preserve corridor

    A planning study is currently being undertaken to identify and preserve a corridor for a future bypass of Innisfail...

    No image supplied
  9. Bruce Highway (Innisfail – Cairns) and Munro street (Babinda) intersection upgrade

    We are progressing a project to upgrade the intersection of the Bruce Highway and Munro Street at Babinda...

    No image supplied
  10. Bruce Highway, (Ingham – Innisfail) Ingham to Cardwell Range Deviation, plan and preserve corridor

    The department has been actively working with the community to address the challenges associated with the Bruce Highway from South of Ingham to the Cardwell Range...

    The map shows the locality of the existing Bruce Highway, from south of Ingham, north through the Gairloch floodway and up to the Cardwell Range. Cardwell is northeast of the map. A solid dark blue line west of the Bruce Highway indicates the current proposed Ingham to Cardwell deviation project corridor. This is known as the Western 2A Deviation, which has been gazetted as future state-controlled road. The local road network, including Halifax Road and Lannercost Street are also highlighted on the map.
  11. Bruce Highway, Cairns Southern Access Corridor (Stage 3), Edmonton to Gordonvale

    A 10.5km upgrade and duplication of the Bruce Highway between Edmonton and Gordonvale is being delivered. The project is Stage 3 of the Cairns Bruce Highway Upgrade Master Plan released in 2010...

    John Davies Bridge, Bruce Highway, between Edmonton to Gordonvale
  12. Bruce Highway, Cairns Southern Access Corridor (Stage 5), Foster Road upgrade intersection

    Planning for the Bruce Highway, Cairns Southern Access Corridor, (Stage 5) Foster Road upgrade intersection project will assess and recommend options to upgrade this intersection...

    No image supplied
  13. Bruce Highway, Haughton River Floodplain Upgrade, construct bridges and approaches

    Safety and flood resilience upgrades to the Bruce Highway at Giru; including wider and higher-level bridges, reconfigured intersections and 13.5km of upgraded highway...

  14. Burke Developmental Road (Normanton - Dimbulah), progressive sealing

    We are progressively sealing unsealed sections of the Burke Developmental Road between Almaden and Chillagoe...

    No image supplied
  15. Burke Developmental Road (Normanton – Dimbulah), pave and seal

    We are delivering the progressive sealing of Burke Developmental Road (Normanton – Dimbulah)...

    Burke Developmental Road
  16. Cairns Bruce Highway Upgrade master plan

    The Cairns Bruce Highway Upgrade master plan was released in 2010. It was the result of a planning study that investigated long term, multi-modal transport planning options to address the impacts of...

    No image supplied
  17. Cairns Southern Access Cycleway, construct cycleway

    We are reinvesting project savings to deliver a new off-road cycleway adjacent to the Bruce Highway consistent with the Cairns Bruce Highway Upgrade Masterplan...

    Cairns Southern Access Cycleway
Previous Page (disabled)
  1. Page 1
  2. Page 2
  3. Page 3