Recreational boating facility projects completed since July 2017

Location/facility State electorate Scope of works Completion date Funding source
State-wide
Recreational Boating Facilities Demand Forecasting Study 2017 N/A Study to assist in planning and prioritising projects for inclusion into the program from 2018-19 and beyond Dec-17 MIIP
Far North
Bellenden Ker Hill Upgrade existing boat ramp to current standards Dec-17 MIF
Fearnley Street, Cairns Cairns Rebuild existing boat ramp plus new split-level floating walkway Mar-18 MIF
Edmonton boat ramp Mulgrave Installation of new floating walkway Jun-18 MIF
Mourilyan breakwater extension at boat ramp Hill Breakwater extension at Mourilyan boat ramp Jul-18 MIF
Port Douglas boat harbour Cook Dredging to deepen and widen the entrance channel Apr-18 MIF
MIIP
Cairns, Bluewater Marina  Barron River  Widening of the boat ramp, installation of a floating walkway and improved turning area for vehicles  Apr-19  MIF 
Northern
Hell Hole landing boat ramp Burdekin Resurface boat ramp Jul-17 MIIP
Barramundi Creek Burdekin Upgrade existing boat ramp plus installation of floating walkway April-18 MIF
Plantation Creek boat ramp Burdekin Resurface boat ramp Jun-18 MIIP
Dungeness (Lucinda)  Hinchinbrook  Additional floating walkway  Dec-18  MIIP 
North West
Burketown Traeger Rebuild and widen existing boat ramp from 2 to 3 lanes Dec-17 MIF
Fitzroy
Ski Gardens, Huet Street, Wandal, Rockhampton Rockhampton Rebuild existing boat ramp Aug-17 MIF
Causeway Lake, Mulambin Keppel Rebuild existing boat ramp to current standards Aug-17 MIF
Rosslyn Bay Boat Harbour Keppel Dredging for floating walkways Sep-17 MIIF
Glebe Weir Callide Upgrade existing boating facility Sep-17 MIF
Boyne River Gladstone Grant funding to Gladstone Ports Corporation to dredge entrance channel Aug-18 MIIP
Robert Clark Drive, Callaghan Park, North Rockhampton  Rockhampton  New 4-lane boat ramp and floating walkway  Aug-18  MIF 
Coorooman Creek  Keppel  Feasibility study to determine marking of the entrance channel  Feb-19  MIIP 
Banksia Road, Stanage   Upgrade existing boat ramp and install breakwater and floating walkway Oct-19   MIF
Mackay / Whitsunday
Port Binnli, Mackay Mackay Installation of an additional floating walkway Aug-17 MIF
Carpet Snake Point, St Helens Beach Whitsunday Upgrade existing boat ramp and causeway Oct-17 MIF
Starboard Road, Bowen Burdekin Widen existing boat ramp plus installation of a new floating walkway Nov-17 MIF
River Street, Mackay Mackay Upgrade existing boat ramp plus installation of a floating walkway Nov-17 MIF
Horseshoe Bay Road, Greys Bay, Bowen Burdekin Rebuild and widen existing boat ramp Nov-2017 MIF
Half Tide Tug Harbour  Mirani  New floating walkway (grant funding to North Queensland Bulk Ports)  Jun-18  MIF 
Grasstree Beach  Mirani  Upgraded boat ramp and floating walkway  May-19  MIF 
Central Coast
Wide Bay
River Heads Hervey Bay Rebuild existing south-western 2-lane boat ramp plus installation of new floating walkway Apr-18 MIF
Urangan Boat Harbour Hervey Bay Installation of 2 new floating walkways Apr-18 MIF
Bullock Point  Gympie  Bullock Point, new 3-lane boat ramp plus floating walkway and piling  Jun-18  MIF
North Coast
Lara Street, Currimundi Caloundra Rebuild existing boat ramp Oct-17 MIF
Fisherman’s Road, Maroochydore Ninderry Rebuild existing boat ramp to current standard plus installation of new floating walkway Nov-17 MIF
Pelican Park, Clontarf Redcliffe Removal of old pontoon, rebuild boat ramp, installation of new floating walkway and queuing beach Apr-17 MIF
Bellara, Bribie Island Pumicestone Maintenance dredging May-18 MIIP
Mooloolaba Harbour, Penny Lane  Maroochydore  New deep-water access pontoon  Oct-17  MIF 
Scarborough (Thurect Pde)  Redcliffe  Widen and repair boat ramp  Sep-18  MIF/MIIP 
Uhlmann Road, Burpengary East Bancroft Installation of new floating walkway Oct-19  MIF
Metro
Manly Boat Harbour Lytton Replace southern deep-draught vessel pontoon Mar-18 MIF
One Mile entrance channel, Dunwich Cleveland Bed levelling of the entrance channel Feb-18 MIIP
Deep Water Bend Sandgate Repair pontoon Mar-18 MIIP
William St, Cleveland Point Cleveland Dredging to deepen and widen the entrance channel and basin Aug-17 MIIP
Brisbane River, Hamilton North Clayfield Installation of new pontoon Apr-18 MIF
Macleay Island  Redlands  Construction of a new boat ramp  Oct-18  MIF 
Rocky Point, Russell Island  Redlands  Barge/boat ramp feasibility study  Feb-19  MIIP 
Manly Boat Harbour  Lytton  Entrance channel deepening to 2.5m LAT Jul-19  MIF 
Kedron Brook (Brisbane Airport floodway)  Clayfield  New channel dredged to boat ramp  Oct-18  MIIP 
South West
Dirranbandi Warrego Construction of a new single-lane boat ramp Oct-17 MIF
Dirranbandi Warrego Installation of new pontoon Dec-17 MIF
Darling Downs
Chinchilla Weir Callide Installation of new pontoon Dec-17 MIF
Marshall St, Goondiwindi  Southern Downs  Installation of new pontoon  May-18  MIF 