Project cost estimating manual
This manual guides the preparation of cost estimates for all departmental transport infrastructure capital works projects.
- Project Cost Estimating Manual: 8th Edition - December 2021
- Annexure A: Project Site Visit Checklist
- Annexure B: Cost Estimate Review Checklist
- Annexure D: Work Breakdown Structure (Principal's Activities)
- Annexure E: Contingency Example for Strategic Estimates
- Annexure E: Strategic Contingency / Risk Table
- Annexure F: Principal Arranged Insurance (PAI)
- Annexure G: Description of Estimate Categories
- Annexure H: Escalation Calculator
- Annexure I: Project Cost Estimating Control Checklist (PCECC)
- Annexure J: Estimate Report Format
- Annexure K: Land Resumption Process Flowchart
- Annexure L: Project cost estimate summary and approval (example)
- Annexure M: Work Breakdown Structure (Rail)
- Annexure N: Cost Categories for Infrastructure Projects
- Last updated 23 August 2022