Category 5 - Pavements, Subgrade and Surfacing
- MRTS05 Unbound Pavements
- MRTS07A Insitu Stabilised Subgrades using Quicklime or Hydrated Lime
- MRTS07B Insitu Stabilised Pavements using Cement or Cementitious Blends
- MRTS07C Insitu Stabilised Pavements using Foamed Bitumen
- MRTS08 Plant-Mixed Heavily Bound (Cemented) Pavements
- MRTS09 Plant-Mixed Foamed Bitumen Stabilised Pavements
- MRTS10 Plant-Mixed Lightly Bound Pavements
- MRTS11 Sprayed Bituminous Treatments (Excluding Emulsion)
- MRTS12 Sprayed Bituminous Emulsion Surfacing
- MRTS13 Bituminous Slurry Surfacing
- MRTS17 Bitumen and Multigrade Bitumen
- MRTS18 Polymer Modified Binder (including Crumb Rubber)
- MRTS19 Cutter Oils
- MRTS20 Cutback Bitumen
- MRTS21 Bituminous Emulsion
- MRTS22 Supply of Cover Aggregate
- MRTS23 Supply and Delivery of Quicklime and Hydrated Lime for Road Stabilisation
- MRTS30 Asphalt Pavements
- MRTS32 High Modulus Asphalt (EME2)
- MRTS36 Recycled Glass Aggregate
- MRTS38 Pavement Drains
- MRTS39 Lean Mix Concrete Sub-base for Pavements
- MRTS40 Concrete Pavement Base
- MRTS41 Concrete Pavement Base (Ancillary Works)
- MRTS42 Supply of Wax Emulsion Curing Compound for Concrete
- MRTS43 Supply of Armourstone
- MRTS57 Geotextiles for Geotextile Reinforced Seals
- MRTS58 Geosynthetics for Subgrade and Pavement Reinforcement
- MRTS101 Aggregates for Asphalt
- MRTS102 Reclaimed Asphalt Pavement Material
- MRTS103 Fillers for Asphalt
- MRTS104 Asphalt Geosynthetics for Delaying Pavement Reflective Cracking
- MRTS110 Coloured Surface Treatments
- MRTS111 High Friction Surface Treatments
- MRTS115 Insitu Stabilised Subbases using Triple Blend
MRTS05 Unbound Pavements (July 2022):
- MRTS05 Technical Specification
- MRTS05 Technical Specification Annexure
- MRS05 Specification (Measurement)
- MRS05 Specification (Measurement) Annexure
MRTS07A Insitu Stabilised Subgrades using Quicklime or Hydrated Lime (July 2024):
- MRTS07A Technical Specification
- MRTS07A Technical Specification Annexure
- MRS07A Specification (Measurement)
- MRS07A Specification (Measurement) Annexure
MRTS07B Insitu Stabilised Pavements using Cement or Cementitious Blends (July 2024):
- MRTS07B Technical Specification
- MRTS07B Technical Specification Annexure
- MRS07B Specification (Measurement)
- MRS07B Specification (Measurement) Annexure
MRTS07C Insitu Stabilised Pavements using Foamed Bitumen (July 2024):
- MRTS07C Technical Specification
- MRTS07C Technical Specification Annexure
- MRS07C Specification (Measurement)
- MRS07C Specification (Measurement) Annexure
MRTS08 Plant-Mixed Heavily Bound (Cemented) Pavements (November 2022):
- MRTS08 Technical Specification
- MRTS08 Technical Specification Annexure
- MRS08 Specification (Measurement)
- MRS08 Specification (Measurement) Annexure
Checklist
MRTS09 Plant-Mixed Foamed Bitumen Stabilised Pavements (July 2024):
- MRTS09 Technical Specification
- MRTS09 Technical Specification Annexure
- MRS09 Specification (Measurement)
- MRS09 Specification (Measurement) Annexure
MRTS10 Plant-Mixed Lightly Bound Pavements (November 2022):
- MRTS10 Technical Specification
- MRTS10 Technical Specification Annexure
- MRS10 Specification (Measurement)
- MRS10 Specification (Measurement) Annexure
Checklist
MRTS11 Sprayed Bituminous Treatments (Excluding Emulsion) (November 2023):
- MRTS11 Technical Specification
- MRTS11 Technical Specification Annexure
- MRS11 Specification (Measurement)
MRTS12 Sprayed Bituminous Emulsion Surfacing (November 2018):
- MRTS12 Technical Specification
- MRTS12 Technical Specification Annexure
- MRS12 Specification (Measurement)
- MRS12 Specification (Measurement) Annexure
MRTS13 Bituminous Slurry Surfacing (November 2018):
- MRTS13 Technical Specification
- MRTS13 Technical Specification Annexure
- MRS13 Specification (Measurement)
- MRS13 Specification (Measurement) Annexure
MRTS17 Bitumen and Multigrade Bitumen (March 2022):
MRTS18 Polymer Modified Binder (including Crumb Rubber) (November 2023):
MRTS19 Cutter Oils (March 2020):
MRTS20 Cutback Bitumen (July 2020):
MRTS21 Bituminous Emulsion (July 2020):
MRTS22 Supply of Cover Aggregate (July 2020):
- MRTS22 Technical Specification
- MRTS22 Technical Specification Annexure
- MRS22 Specification (Measurement)
- MRS22 Specification (Measurement) Annexure
MRTS23 Supply and Delivery of Quicklime and Hydrated Lime for Road Stabilisation (July 2024):
MRTS30 Asphalt Pavements (March 2024):
- MRTS30 Technical Specification
- MRTS30 Technical Specification Annexure
- MRS30 Specification (Measurement)
MRTS32 High Modulus Asphalt (EME2) (March 2024):
MRTS36 Recycled Glass Aggregate (November 2020):
MRTS38 Pavement Drains (July 2017):
MRTS39 Lean Mix Concrete Sub-base for Pavements (November 2018):
Checklists
MRTS40 Concrete Pavement Base (November 2018):
- MRTS40 Technical Specification
- MRTS40 Technical Specification Annexure
- MRS40 Specification (Measurement)
- MRS40 Specification (Measurement) Annexure
Checklist
- CAC064M Concrete Pavement Base - Assessment of Nominated Mix Submission
- CAC076M Conformance and As Constructed Survey - Pavements
MRTS41 Concrete Pavement Base (Ancillary Works) (July 2023):
- MRTS41 Technical Specification
- MRTS41 Technical Specification Annexure
- MRS41 Specification (Measurement)
MRTS42 Supply of Wax Emulsion Curing Compound for Concrete (July 2017):
MRTS43 Supply of Armourstone (July 2022):
MRTS57 Geotextiles for Geotextile Reinforced Seals (July 2024):
- MRTS57 Technical Specification
- MRTS57 Technical Specification Annexure
- MRS57 Specification (Measurement)
MRTS58 Geosynthetics for Subgrade and Pavement Reinforcement (July 2024):
- MRTS58 Technical Specification
- MRTS58 Technical Specification Annexure
- MRS58 Specification (Measurement)
MRTS101 Aggregates for Asphalt (November 2022):
MRTS102 Reclaimed Asphalt Pavement Material (March 2019):
MRTS103 Fillers for Asphalt (July 2017):
MRTS104 Asphalt Geosynthetics for Delaying Pavement Reflective Cracking (July 2024):
- MRTS104 Technical Specification
- MRTS104 Technical Specification Annexure
- MRS104 Specification (Measurement)
MRTS110 Coloured Surface Treatments (March 2023):
- MRTS110 Technical Specification
- MRTS110 Technical Specification Annexure
- MRS110 Specification (Measurement)
MRTS111 High Friction Surface Treatments (March 2023):
- MRTS111 Technical Specification
- MRTS111 Technical Specification Annexure
- MRS111 Specification (Measurement)
MRTS115 Insitu Stabilised Subbases using Triple Blend (July 2024):
- Last updated 31 July 2024