Clump Point Mission Beach boating infrastructure project

Overview:

The Department of Transport and Main Roads (TMR) is undertaking works to upgrade the public boating facilities at Mission Beach Clump Point.

A contract for the delivery of element one of the project was awarded to MGN Civil Pty Ltd in mid-December 2018.

 
Location:
Clump Point Mission Beach

Project info

The Department of Transport and Main Roads (TMR) received the final environmental approval for the Mission Beach Clump Point boating infrastructure upgrade project from the Great Barrier Reef Marine Park Authority (GBRMPA) on 29 June 2018.

Public tenders for construction were advertised and closed on 24 October 2018. A contract for the delivery of Element One of the project was awarded to MGN Civil Pty Ltd in mid-December 2018.

Element One of the construction consists of:

  • a new detached breakwater
  • upgrade to the existing breakwater
  • boat ramp upgrade with an additional lane
  • northern car park upgrade
  • new toilet facilities in southern car park.

Element Two of the project is still under tender evaluation, with a contract expected to be awarded in early 2019. 

An important part of the project delivery is the development of a detailed traffic management plan to manage all parts of the project throughout the construction period. 

On-site works are planned to begin in February 2019 (weather permitting). 

The Clump Point public boat ramp will be closed for public use during construction, with completion due in December 2019. Access for the small number of commercial users will be maintained throughout construction.

View the proposed map for the new facilities at Mission Beach Clump Point.

Alternative public boat ramp locations for use during construction:

To the north of Clump Point include (in order of distance north):

  • Maria Creek (sheltered)
  • Kurrimine Beach (open beach ramp)
  • Mourilyan Harbour (sheltered all-tide ramp, with floating walkway)

To the south of Clump Point include (in order of distance south):

  • South Mission Beach (open beach ramp)
  • Jacky Jacky Street, South Mission Beach (sheltered creek ramp)
  • Hull Heads, south bank of Hull River (sheltered)
  • Tully Heads (sheltered creek ramp)

Further information on the project timing and progress will be provided on this page.

More information

Further information or questions can be directed by post: 

The Project Manager
Department of Transport and Main Roads
PO Box 1549
BRISABANE CITY  QLD  4001

or

By email to: Boatinginfrastructure@tmr.qld.gov.au

Last updated
21 December 2018