Carnarvon Highway (Surat – Roma), Balonne River Surat, replace bridge and approaches, planning
Carnarvon Highway (Surat – Roma), Balonne River Surat, replace bridge and approaches, planning
Southern Queensland Region
Inland Freight Route (Mungindi to Charters Towers) Upgrades
Location
Surat
Timing
Planning and preliminary design is expected to be completed in late 2027
Status
Planning
Carnarvon Highway (Surat – Roma), Balonne River Surat, replace bridge and approaches, planning
The Queensland Government is planning to replace the Surat Bridge over the Balonne River on the Carnarvon Highway.
The preferred option is to build a new bridge immediately east of the existing bridge, designed to improve safety, flood resilience and access for higher productivity vehicles.
Benefits
Improves safety
Improves network efficiency
Improves flood immunity
Contributes to economy
Contributes to regional growth
Better road access
Key features
New bridge constructed east of the existing bridge, with improved geometry and strength to support higher productivity vehicles.
Shared path across the bridge, connecting to the existing local footpath network.
Reinstating the shared path beneath the bridge to connect amenities, parking, camping areas and the boat ramp.
Retaining the Carnarvon Highway as the main route through Surat.
Reconfiguring Fisherman’s Park.
Upgrade to the Carnarvon Highway and Bymount Road intersection.
Funding
The Carnarvon Highway (Surat – Roma), Balonne River Surat, replace bridge and approaches, planning is part of the $1 billion Inland Freight Route Upgrade program (IFRU).
The $1 billion IFRU is a jointly committed initiative by the Australian Government ($800 million) and Queensland Government ($200 million), which will ultimately provide an alternative to the Bruce Highway by upgrading the IFR to allow for higher productivity vehicles including Type 2 road trains and Higher Mass Limit vehicles.
Investment ID: 3801040
Current status
We're currently seeking feedback from community members.
Community information session – November 2026
Community members can learn more, speak with the project team and provide feedback at an upcoming drop-in session:
Where: The Surat Hub
When: Thursday 12 November 2026, 10am–3pm
Feedback is particularly sought on the proposed design of the bridge and approaches, the community’s vision for Fisherman’s Park, and opportunities to recognise the history of the existing bridge.
Feedback received will help inform the preliminary design, which is due to be completed in late-2027.
Project location map
Layout of the proposed bridge replacement
Last updated: 6 November 2026
Carnarvon Highway Surat Roma Balonne River Surat replace bridge
The Carnarvon Highway (Injune - Rolleston), Baffle Creek bridge upgrade project will improve safety and network efficiency by widening the bridge approaches and the existing bridge structure.
The Queensland Government has improved safety and network efficiency by replacing the 3 major culverts with larger structures and widening the pavement to 10m approximately 6km north of Roma.