The department is building a new upstream bridge over the Ross River in Townsville, adjacent to the existing Bowen Road Bridge. This will increase the capacity of the river crossing from 2 to 4 lanes.
The Bowen Road duplication project will be delivered in conjunction with works currently under construction on Stuart Drive between University Road and the Bowen Road Bridge, adjacent to this project. The Bowen Road Bridge duplication project will improve safety and driveability for the 24,000 vehicles using this bridge daily.
The existing 2-way bridge will be converted to 2 lanes for outbound traffic, in line with the upgrade of the Stuart Drive. The bridge duplication project will deliver pavement upgrades to the bridge approaches and upgraded lighting as well as CCTV installation.
There will also be upgrades to the pedestrian and bike crossings to improve safety for all road users, as well as improved connections to a refurbished underpass pathway.
Benefits
- Improves safety
- Increases capacity
- Improves network efficiency
- Increases traffic flow
- Reduces peak hour congestion
- Better road access
- Contributes to economy
- Contributes to regional growth
- Better active transport
Key features
- Duplicate the Bowen Road Bridge adjacent to the existing Bowen Road Bridge
- Pavement rehabilitation at the bridge approaches
- Lighting upgrades and installation of CCTV footage
- Upgrade pedestrian and bike crossings
- Refurbish underpass pathway with improved connections
Funding
This project is fully funded by the Queensland Government. Investment ID 2419830
- Total investment
- $99.8 million
- Queensland Government
- $99.8 million
Current status
Construction started in July 2024 and will be completed in mid-2026, construction scheduling and weather conditions permitting.
Initial consultations with stakeholders directly affected by the project started in mid-2022. In early 2023, engagement activities expanded to include the wider community. This consultative process is set to carry on throughout the project's duration to ensure ongoing communication and stakeholder involvement.