Far North Queensland disaster recovery works
The Queensland Government has made significant progress in repairing roads damaged by Tropical Cyclone Jasper in December 2023 and the North and Far North Tropical Low in February 2025.
Reconstruction works on Mossman – Mount Molloy Road are underway to repair multiple landslips from Tropical Cyclone Jasper in December 2023.
The upslope slips measure up to 19m, while the downslope slip sites range from 4m to 9m.
These works will restore the road to its pre-cyclone function.
Eleven geotechnical sites have been repaired, with work ongoing at a further two slope sites.
Key reconstruction measures include:
Betterment works to improve drainage at three locations on the road will be delivered later in 2026.
The recovery works are jointly funded by the Australian and Queensland Governments through the Disaster Recovery Funding Arrangements (DRFA).
Reconstruction works are underway.
For up–to–date traffic and travel information on road conditions, incidents, vehicle crashes, roadworks and route information updates, visit QLDTraffic.
Last updated: 9 July 2026