Beerburrum to Nambour Rail Upgrade (Stage 1)
The Beerburrum to Nambour Rail Upgrade (B2N) project covers about 40km of the North Coast Line...
The Beerburrum to Nambour Rail Upgrade (B2N) project covers about 40km of the North Coast Line...
We are upgrading the Bruce Highway to 6-lanes between Caboolture-Bribie Island Road and Steve Irwin Way (Exit 163)...
Major construction is complete on the Bruce Highway – Caloundra Road to Sunshine Motorway project. The highway has been upgraded to 6-lanes between Caloundra Road and the Sunshine Motorway...
Planning project to investigate and prioritise upgrades to the Bruce Highway between the Pine River and Caloundra Road...
The Deception Bay Road Interchange project is being delivered as part of the Bruce Highway Upgrade to improve safety, ease congestion and cater for future traffic growth...
We are undertaking a planning study to investigate future upgrade requirements on the Bruce Highway between Deception Bay Road and Caboolture-Bribie Island Road...
Upgrade to both the Maroochydore Road and Mons Road interchanges...
We have completed early planning to determine future upgrade needs for the Bruce Highway between the Sunshine Motorway and Maroochydore Road...
We are undertaking a $7.5 million route strategy package to improve safety along sections of Caboolture Connection Road (Lower King Street and King Street) between the Bruce Highway and D’Aguilar...
The Caboolture to Maroochydore Corridor Study proposes a passenger rail service branching off the North Coast Line at Beerwah and extending through Caloundra to Maroochydore...
We are creating opportunities for sustainable travel on the Sunshine Coast through a priority bus way and improved cycle facilities from Caloundra to Maroochydore...
We are finalising planning for the upgrade of the intersections at Diamond and Elm Streets and Myall and Elm Streets at Cooroy...
A planning study was undertaken along Cooroy-Noosa Road to determine what improvements may be considered in the future to improve road safety and performance...
We are undertaking detailed design to improve safety on the D'Aguilar Highway to install a 1 metre wide centre line treatment...
We are widening Deception Bay Road from 4 to 6 lanes through Anzac Avenue intersection to Morris Road intersection...
A planning study of Eumundi-Noosa Road was undertaken to identify future upgrade needs and safety improvements measures for the road with safety and performance a key focus of the study...
Intersection upgrade at Peachester Road and Old Gympie Road...
The department has identified and preserved a new rail corridor between Landsborough and Nambour, which will replace the existing North Coast line through this section...
We are investigating a future expansion of the park 'n' ride facilities at Mango Hill station...
The department has developed a preferred option for staged improvements to Maroochydore Road, Kunda Park to improve safety and relieve congestion...
Last updated: 23 June 2021