Kingston station precinct upgrade
The Kingston station precinct is being upgraded as part of the Logan and Gold Coast Faster Rail project to improve accessibility, safety and customer experience for the community.
The updated design better integrates the station with the Kingston Butter Factory Cultural Precinct, an important historical community and cultural hub, with improved station entry points and bus stops off Milky Way.
The repositioned station away from the Kingston Road bridge avoids the need to rebuild the bridge, significantly reducing community disruption, and a rebalanced park ‘n’ ride on both sides of the station encourages improved access and capacity for customers.
These designs have been further developed by the ActivUs Alliance following initial design work this year and incorporating feedback from prior community and stakeholder consultation.
Benefits
- Improves safety
- Accessibility
- Increases capacity
- Reduces travel time
- Improves network efficiency
- Contributes to economy
- Better active transport
- Reduces peak hour congestion
Key features
The Kingston station precinct upgrade will provide:
- a better connection from the relocated station to the Kingston Butter Factory, ensuring safe access from the car park and bus stops and improving pedestrian flow to cater for events
- improved safety and customer experience with lighting and CCTV throughout the station and park ‘n’ ride and increased platform coverage
- a pedestrian overpass connecting the station building to the platforms
- improved access and parking capacity with park ‘n’ rides on both sides of the station
- better active transport connections and a secure bicycle enclosure.
Download the Kingston station precinct factsheet.
Download the Kingston station precinct updated design map.
Current status
Community engagement
Thank you to everyone who shared their feedback with us on the updated station precinct design. A summary of engagement outcomes is now available.
There is a lot happening across the project. Explore the latest updates on every station precinct and level crossing removal.








