The Kuraby station precinct is being upgraded as part of the Logan and Gold Coast Faster Rail project to improve accessibility, safety and customer experience.
The updated station design includes a new footbridge, lift and stairs to improve station access and provide better connections across the rail corridor to local destinations in the community.
The station design has been further developed by the ActivUs Alliance following initial design work this year and incorporating feedback from prior community and stakeholder consultation.
The Kuraby station precinct also includes the removal of the Beenleigh Road level crossing, where a new road-over-rail bridge is being built to improve safety, local walkability and access across the rail corridor. This is the first section of works to start construction in the precinct.
Benefits
- Improves safety
- Accessibility
- Improves network efficiency
- Reduces peak hour congestion
- Better road access
- Reduces travel time
- Increases capacity
- Better active transport
Key features
The Kuraby station precinct upgrade will provide:
- a modern, more accessible station
- improved safety and customer experience with lighting and CCTV throughout the station and park ‘n’ ride and increased platform coverage
- a new footbridge, lift and stairs to improve station and cross-corridor connections
- improved park ‘n’ ride facilities on Jacob Lane
- enhanced walking and cycling connections to the station and local destinations.
Download the Kuraby station precinct factsheet.
Download the Kuraby station precinct updated design map.
The Kuraby level crossing removal will provide:
- a new road-over-rail bridge to improve safety and ease traffic congestion
- improved traffic flow through local road and intersection realignments
- safer pedestrian connections with raised pedestrian and signalised crossings
- accessible pathways on both sides of the bridge to enhance pedestrian and cyclist connectivity
- a widened bridge to allow for future expansion of Beenleigh Road
Download the Open Level Crossing Removal, Kuraby factsheet.
Current status
Community engagement
Thank you to everyone who shared their feedback with us on the station precinct updated design. A summary of engagement outcomes is now available.
Beenleigh Road level crossing upgrade
Thanks to everyone who provided feedback on the updated Kuraby level crossing removal design in late 2025. We will share a summary of the engagement outcomes and how feedback has informed the project with the community by mid-2026.
The Bielby Hull Joint Venture has commenced construction on the new road-over rail bridge in Kuraby. While construction is underway, the community can expect increased noise, dust and vibration as well as road and pedestrian journey changes. We will keep the community updated.
There is a lot happening across the project. Explore the latest updates on every station precinct and level crossing removal.