Natural Disaster Program

More than 1400 projects are underway to restore roads across Queensland damaged by floods and bushfires. Communities are being reconnected and regional economic recovery is being supported following damage to the state-controlled road network in 2020–26.

Key features

  • Restoring access for communities and businesses. 
  • Restoring damaged roads and road surfaces.
  • Repairing damaged structures, including bridges and culverts.
  • Repairing damaged slopes and batters along roads.
  • Clearing silt and debris.

Benefits

  • Restores damaged infrastructure
  • Contributes to economy
  • Contributes to regional growth

About the program

  • The Natural Disaster Program reconnects Queenslanders by repairing parts of the state-controlled road network damaged by natural disasters.
  • Damaged sites are restored to their pre-disaster level of service.
  • In the first 3 months after disaster events, emergency works such as debris clearing and temporary road repairs are undertaken. This enables roads to be used safely while geotechnical and environmental investigations, surveys and detailed design for reconstruction works are completed, where required.
  • Most reconstruction works are completed within 2 financial years after the financial year in which the disaster event occurred.
  • Where possible, the program also supports the resilience of state roads to future disasters.

Current status

  • Damage assessments and repairs are underway after monsoonal rainfall and tropical cyclones Koji and Narelle impacted most of Queensland from late December 2025 to April 2026.
  • Detailed design and repairs are underway following significant disaster events in 2024–25, including flooding in northern and western Queensland and Tropical Cyclone Alfred in South East Queensland.
  • Substantial progress has been made on road repairs after significant disaster events in 2023–24, including Tropical Cyclone Jasper in far north Queensland, severe storms across southern Queensland and flooding associated with Tropical Cyclone Kirrily in western Queensland.
  • Substantial progress has been made on reconstruction works on the Cunningham Highway where bushfires caused significant slope damage at Cunninghams Gap in late 2019.
Funding

The recovery works are jointly funded by the Australian and Queensland Governments through the Disaster Recovery Funding Arrangements (DRFA).

Traffic info

These works may change traffic conditions that impact your travel. Visit QLDTraffic to plan your journey.

25 Projects in Natural Disaster Program

Bruce Highway (Ingham - Innisfail), Dallachy Road, install floodway

The Queensland Government has upgraded the Bruce Highway at Dallachy Road near Tully, improving flood resilience on this section of the highway.

  • Far North District
  • Completed
No image supplied

Bruce Highway (Pine River - Cairns), Road Operations Improvements

This project has been completed and provides Intelligent Transport System infrastructure at various locations along the Bruce Highway between Pine River and Cairns.

  • Far North District
  • Fitzroy District
  • Mackay Whitsunday District
  • North Coast District
  • Northern District
  • Wide Bay Burnett District
No image supplied

Bruce Highway, Cairns Southern Access Corridor (Stage 5), Foster Road, funding allocation

Planning for the Bruce Highway, Cairns Southern Access Corridor (Stage 5), Foster Road upgrade intersection project will assess and recommend options to upgrade this intersection.

  • Far North District
  • Planning
No image supplied

Bulloo Developmental Road (Cunnamulla – Thargomindah), Paroo River bridge replacement

The Queensland Government is committed to building back better and ensuring the state-controlled road network is more resilient to future disasters, safeguarding communities and supporting economic recovery.

  • South West District
  • Detailed design
No image supplied

Cairns Bruce Highway Upgrade master plan

The Cairns Bruce Highway Upgrade master plan was released in 2010. It was the result of a planning study that investigated long term, multi-modal transport planning options to address the impacts of urban growth, congestion and traffic accidents.

  • Far North District
  • Construction
No image supplied

Cairns Transit Network

Cairns Transit Network is the first busway planning project of its kind in regional Queensland. It will improve public transport in Cairns by giving buses priority, either in separate bus lanes or on dedicated bus-only lanes (busways) which will be separated from general traffic.

  • Far North District
  • Planning
No image supplied

Cairns Transport Study, planning

By 2046, the Cairns local government area is expected to increase by approximately 59,000 residents. In addition to the substantial visitor numbers in the region, this significant residential growth will have an impact on the safety, efficiency and accessibility of the Cairns urban transport network.

  • Far North District
  • Planning
No image supplied

Cairns Western Arterial Road, Redlynch Connector Road to Captain Cook Highway, duplication

The Cairns Western Arterial Road is being upgraded between Redlynch Connector Road and Captain Cook Highway. This upgrade will transform this section of road into a 4-lane carriageway, improving safety, capacity, and traffic flow for the region.

  • Far North District
  • Construction
Concept design map

Cairns Western Arterial Road, upgrade strategy, planning

The department is conducting a planning study for the Cairns Western Arterial Road to identify future upgrades that will improve safety, capacity, and transport efficiency. The study area spans the entire length of the Cairns Western Arterial Road, from the Captain Cook Highway to Mulgrave Road, and includes the proposed Bruce Highway, Cairns Southern Access Corridor (Stage 6), Earlville Bypass.

  • Far North District
  • Planning
No image supplied

Cape York Region Package Stage 2

The Cape York Region Package Stage 2 will deliver infrastructure upgrades on the Cape York Peninsula between 2019-20 and 2028-29, improving connectivity, access to health and essential services, freight, education and economic opportunity for local communities.

  • Far North District
  • Construction
No image supplied

Captain Cook Highway Cairns – Mossman 2024 Disaster Recovery Funding Arrangements reconstruction

The Queensland Government has made significant progress on the reconstruction works along the Captain Cook Highway. As part of the comprehensive disaster recovery program, these works aim to restore vital infrastructure and prioritise the safety of all road users.

  • Far North District
  • Construction
No image supplied

Cunningham Highway (Ipswich – Warwick), 2020 Disaster Recovery Funding Arrangements reconstruction works

The Queensland Government has restored the damaged section of the Cunningham Highway at Cunninghams Gap. This 2km stretch, leading up to the Allan Cunningham monument, suffered significant road damage during the bushfires in 2019.

  • South Coast District
  • Completed
Aerial image of Cunningham Highway at Cunninghams Gap

Far North Queensland disaster recovery works

The Queensland Government has made significant progress in repairing roads damaged by Tropical Cyclone Jasper in December 2023 and the North and Far North Tropical Low in February 2025.

  • Far North District
  • Construction
Aerial image of Kuranda Range Road, showing large green trees and a curved road which has temporary stabilisation repairs following a major landslip on the side of the road.

Flood resilience works

The Queensland Government is improving the resilience of the state-controlled road network at priority sites impacted by recent severe weather events.

  • Construction
Concreate slab on the side of a road with a drainage to help prevent flooding.

Gillies Range Road (Tablelands Regional Council) 2024 Disaster Recovery Funding Arrangements reconstruction works

Critical slope reconstruction work is currently underway on 5 upslope and downslope slip sites, with repairs to more sites to commence during 2026.

  • Far North District
  • Construction
Aerial view of the work being carried out on site 3 on the Gillies Range Road.

Gold Coast-Springbrook Road, Disaster Recovery Funding Arrangements reconstruction works

Gold Coast—Springbrook Road sustained a significant number of landslips, rock falls and tree falls during the South Queensland Severe Storms and Rainfall events in December 2023 and January 2024.

  • South Coast District
  • Construction
Aerial view of Gold Coast-Springbrook Road major slip site

Kennedy Highway (Cairns - Mareeba), Barron River bridge (Kuranda), replacement

Pre-construction work has commenced to replace the ageing Barron River bridge at Kuranda to improve network reliability and safety for all road users, while minimising potential environmental and cultural heritage impacts.

  • Far North District
  • Pre-construction
Thumbnail image of bride and inspection unit

Kennedy Highway (Kuranda Range Road) cyclone reconstruction works

Significant progress has been made in restoring the Kennedy Highway (Kuranda Range Road) to its pre-event function following Tropical Cyclone Jasper in December 2023 and the North and Far North Tropical Low in February 2025.

  • Far North District
  • Construction
No image supplied

Kuranda Range Road safety and resilience upgrades

The department is working with the Australian Government to investigate and prioritise safety and resilience upgrades for Kuranda Range Road.

  • Far North District
  • Planning
No image supplied

Mareeba – Dimbulah Road, Mareeba Heavy Vehicle Bypass, planning

The planning for the Mareeba – Dimbulah Road, Mareeba Heavy Vehicle Bypass focused on progressing the southern section of the bypass and reviewing the alignment of the northern section.

  • Far North District
  • Planning
Vehicles travelling along Mareeba–Dimbulah Road locally known as Byrnes Street

Mossman – Daintree Road, 2024 Disaster Recovery Funding Arrangements reconstruction works

Reconstruction works are underway on a section of Mossman – Daintree Road damaged during ex-Tropical Cyclone Jasper.

  • Far North District
  • Construction
No image supplied

Mossman – Mount Molloy Road, 2024 Disaster Recovery Funding Arrangements reconstruction works

Reconstruction works on Mossman – Mount Molloy Road are underway to repair multiple landslips from Tropical Cyclone Jasper in December 2023.

  • Far North District
  • Construction
No image supplied

Mount Spec Road reconstruction works

The Queensland Government is making significant progress on reconstructing 35 disaster-damaged sites along Mount Spec Road. Reconstruction works are ongoing at multiple locations, with nine sites completed and crews working 24 hours a day, 7 days a week while maintaining access for residents, businesses and visitors.

  • Northern District
  • Construction
No image supplied

Next Generation Traffic Signalling Program

The Next Generation Traffic Signalling Program is an initiative aimed at transforming traffic signal infrastructure across Queensland.

  • Central West District
  • Darling Downs District
  • Far North District
  • Fitzroy District
  • Mackay Whitsunday District
  • Metropolitan District
  • North Coast District
  • North West Direct
  • Northern District
  • South Coast District
  • South West District
  • Wide Bay Burnett District
  • Construction
No image supplied

Palmerston Highway cyclone reconstruction works

Tropical Cyclone Jasper reconstruction works have been completed on the Palmerston Highway (Millaa Millaa-Innisfail).

  • Far North District
  • Completed
No image supplied

Last updated: 8 July 2026