Bruce Highway (Brisbane - Gympie), Anzac Avenue to Uhlmann Road upgrade, business case
An upgrade is planned for the Bruce Highway from Anzac Avenue, North Lakes to Uhlmann Road, Burpengary.
Planning
An upgrade is planned for the Bruce Highway from Anzac Avenue, North Lakes to Uhlmann Road, Burpengary.
Planning
An upgrade is planned for the Bruce Highway from Uhlmann Road, Burpengary to Buchanan Road, Morayfield.
Planning
An upgrade is planned for the Bruce Highway from Buchanan Road, Morayfield to Caboolture-Bribie Island Road, Caboolture.
PlanningPlanning investigations have confirmed a preferred option for future upgrades that includes the following:
Collector-distributor roads are built alongside and separate to a highway carriageway. Collector-distributor roads will enhance highway operation and safety by removing traffic undertaking local or short distance trips from the highway and by reducing the need for lane changes to merge or weave through highway traffic.
The Australian and Queensland governments have committed $34 million to develop business cases for planned upgrades to the Bruce Highway between Anzac Avenue and Caboolture–Bribie Island Road:
Bruce Highway Upgrade—Anzac Avenue to Uhlmann Road Investment ID 2349359.
Bruce Highway Upgrade—Uhlmann Road to Buchanan Road Investment ID 2349159.
Bruce Highway Upgrade—Buchanan Road to Caboolture-Bribie Island Road Investment ID 2348820.
Due to the interdependent nature of the upgrades between Uhlmann Road and Caboolture-Bribie Island Road, planning is being completed as one study.
The Anzac Avenue to Uhlmann Road section will progress to detailed design phase early next year. Scoping and early works (detailed onsite investigations) commenced mid-2025. Construction staging, timeframes and duration will be confirmed as the design progresses.
Funding for the completion of detailed design and construction of the upgrades in the remaining sections has not been committed at this time.
Planning for these upgrades started in early 2023 and is nearing completion.
We have confirmed a preferred option for future upgrades to the Bruce Highway between Anzac Avenue and Caboolture-Bribie Island Road which includes a combination of additional lanes and collector-distributor roads.
( https://sc-p-cm.tmr.saas.dataweavers.io/_/media/21e60286ecb8438d9e206a9a11f87def.ashx )
The upgrade will replace the existing two-lane overpass bridge with a new higher and longer overpass. Additional lanes will be provided at new signalised ramp intersections to improve traffic flow efficiency. The upgrade will include significantly improved active transport connections.
The upgrade will replace the existing overpass bridge with a new higher and longer overpass. The existing roundabout ramp intersections will be upgraded to new signalised intersections to better control traffic flow and provide capacity where it is most needed. The upgrade will include significantly improved active transport connections.
The upgrade will replace the existing overpass with two new higher and longer overpass bridges, with additional traffic lanes plus new signalised ramp intersections to improve traffic flow efficiency. A new loop ramp connection will provide uninterrupted flow for traffic travelling from Caboolture towards Brisbane. The upgrade will include significantly improved active transport connections.
An upgrade is planned for the Bruce Highway from Anzac Avenue, North Lakes to Uhlmann Road, Burpengary.
An upgrade is planned for the Bruce Highway from Buchanan Road, Morayfield to Caboolture-Bribie Island Road, Caboolture.
An upgrade is planned for the Bruce Highway from Uhlmann Road, Burpengary to Buchanan Road, Morayfield.
The Queensland Government is implementing cost-effective safety measures to minimise the risk of vehicle and pedestrian incidents, as well as rear-end collisions caused by vehicles turning right across oncoming traffic at this intersection.
This project is delivering safety improvements to provide a better driving experience for all road users and aims to reduce the risk of fatal and serious injury crashes.
The project involved upgrading infrastructure to improve safety, provide a better driving experience for all road users and reduce the risk of fatal and serious injury crashes.
The Queensland Government is investigating ways to improve safety for motorists on the D’Aguilar Highway in the Toowoomba Region.
This project involves replacing a failing culvert on Esk-Hampton Road at Perseverance Creek.
The Queensland Government is undertaking an upgrade of the Spencer Street and William Street intersection in Gatton to improve traffic movement, safety and rideability for road users, pedestrians and bike riders.
A large slow-moving landslide is affecting a section of Gatton–Clifton Road at Mount Whitestone.
This planning project aims to develop long-term strategies to manage the impacts of a slow-moving landslide at Mount Whitestone.
Planning is underway to improve flood immunity of Gatton–Esk Road at Lockyer Creek.
Traffic flow and safety has been improved on Gatton–Helidon Road.
The Queensland Government is installing safety treatments to reduce the frequency of vehicle incidents due to driver fatigue.
This project involves safety upgrades to the Gore Highway (Toowoomba – Millmerran) and Toowoomba–Athol Road.
The Queensland Government is improving safety on the New England Highway to reduce the risk of fatal and serious injury crashes for all road users.
The Queensland Government is investigating future road infrastructure requirements to provide a better driving experience for all road users and to reduce the risk of fatal and serious injury crashes.
The Queensland Government is committed to improving safety and efficiency on the New England Highway at Cooyar.
Design is underway to improve safety for people walking and bike riding when crossing at the Chalk Drive, Ruthven and Victoria streets intersection and the Chalk Drive and Neil Street intersection.
The New England Highway Bikeway aims to provide a safe and accessible route for walking and cycling between Highfields and Toowoomba.
The Next Generation Traffic Signalling Program is an initiative aimed at transforming traffic signal infrastructure across Queensland.
A separated cycle track is being designed along Taylor Street, between Tor and Boundary streets, as part of the Toowoomba–Cecil Plains Road (Taylor Street) bikeway project.
The Queensland Government has completed the business case for the Toowoomba Central Active Transport Link project.
The Queensland Government has successfully completed the Toowoomba City Cycle Paths project. This project, delivered under the Active Transport Investment Program, has transformed Karrool Street and Goode Street into safer, more accessible, and connected transport routes for pedestrians and cyclists.
The Australian and Queensland governments have worked together to deliver the Toowoomba to Brisbane Passenger Rail Strategic Business Case.
The Australian and Queensland governments worked together to deliver the Toowoomba to Gladstone Inland Rail Extension Strategic Business Case.
The Queensland Government has commenced planning to investigate ways to upgrade Toowoomba–Athol Road (locally known as Anzac Avenue) between and including the Toowoomba–Karara Road (locally known as Wyreema Road) and Boundary Street South intersections.
The Queensland Government is upgrading the intersection of Toowoomba–Cecil Plains, Deuble, and Heinemann roads to meet future transport needs.
Toowoomba-Cecil Plains Road is a critical transport route for the Darling Downs region, connecting agricultural communities to markets and essential services.
The Queensland Government is improving safety along 60km of the Warrego Highway between Toowoomba and Dalby. This includes widening the road, flattening batter/roadside edges, adding new signage and line markings, removing roadside hazards, and installing turning lanes at Speed Road, Oakey.
The Warrego Highway East master plan project will determine the future requirements of the Warrego Highway transport corridor.
Last updated: 3 February 2026