Natural Disaster Program

The department is working on about 1300 projects to restore roads across Queensland damaged by floods and bushfires. The department is also reconnecting communities and supporting regional economic recovery after disaster events damaged the state-controlled road network in 2020–26.

Key features

  • Restoring access for communities and businesses. 
  • Restoring damaged roads and road surfaces.
  • Repairing damaged structures, including bridges and culverts.
  • Repairing damaged slopes and batters along roads.
  • Clearing silt and debris.

Benefits

  • Restores damaged infrastructure
  • Contributes to economy
  • Contributes to regional growth

About the program

  • The Natural Disaster Program reconnects Queenslanders by repairing parts of the state-controlled road network damaged by natural disasters.
  • The department restores damaged sites to their pre-disaster level of service.
  • In the first 3 months after disaster events, the department undertakes emergency works such as clearing debris and filling potholes. This enables roads to be used safely while the department completes geotechnical and environmental investigations, surveys and detailed design for reconstruction works, where required.
  • Reconstruction works are completed within 2 financial years after the financial year in which the disaster event occurred.
  • Where possible, the program also supports the resilience of state roads to future disasters.

Current status

  • Damage assessments and emergency works are underway following Ex-Tropical Cyclone Koji and monsoonal rainfall across the northern two-thirds of Queensland from late December 2025 to early 2026.
  • Damage assessments and emergency works are underway following monsoonal flooding affecting the northern two-thirds of Queensland in early 2025.
  • Repairs are underway after record-breaking flooding in March and April 2025 caused widespread damage to western Queensland roads.
  • Following TC Alfred in March 2025, geotechnical investigations and procurement for design are underway for multiple major landslip sites on Gold Coast and Sunshine Coast hinterland roads.
  • A major reconstruction program is underway after significant flooding in north Queensland in early 2025, including on Mount Spec Road north-west of Townsville.
  • Substantial progress has been made on road repairs after significant disaster events in 2023–24, including Tropical Cyclone Jasper in far north Queensland, severe storms across southern Queensland and flooding associated with Tropical Cyclone Kirrily in western Queensland.
  • Repairs have been completed after flooding across northern and central Queensland in early 2023.
  • A substantial recovery program has been completed across southern Queensland, after major disaster events caused extensive damage in 2021–22.
  • Substantial progress has been made on reconstruction works on the Cunningham Highway where bushfires caused significant slope damage at Cunninghams Gap in late 2019.
Funding

The recovery works are jointly funded by the Australian and Queensland Governments through the Disaster Recovery Funding Arrangements (DRFA).

Traffic info

These works may change traffic conditions that impact your travel. Visit QLDTraffic to plan your journey.

32 Projects in Natural Disaster Program

Beenleigh station precinct upgrade

Beenleigh station is a key transfer location between all-stops and express services on the Beenleigh and Gold Coast train lines.

  • South Coast District
  • Pre-construction
Artist impression of Beenleigh Train station showing carpark, pedestrian overpass and lift and stair access.

Bethania station precinct upgrade

The Bethania station precinct is being upgraded to improve accessibility, safety and customer experience.

  • South Coast District
  • Pre-construction

Boundary Road (Coopers Plains), rail level crossing, funding commitment

The department has completed design of a new rail overpass to reduce congestion and address safety concerns at Boundary Road (Coopers Plains) rail level crossing.

  • Metropolitan District
  • Pre-construction
No image supplied

Bulloo Developmental Road (Cunnamulla – Thargomindah), Paroo River bridge replacement

The Queensland Government is committed to building back better and ensuring the state-controlled road network is more resilient to future disasters, safeguarding communities and supporting economic recovery.

  • South West District
  • Detailed design
No image supplied

Captain Cook Highway Cairns – Mossman 2024 Disaster Recovery Funding Arrangements reconstruction

The Captain Cook Highway is undergoing extensive reconstruction to address the significant damage caused by Tropical Cyclone Jasper in December 2023.

  • Far North District
  • Construction
No image supplied

Cleveland - Redland Bay Road, Anita Street to Giles Road, duplicate lanes

We're upgrading Cleveland-Redland Bay Road, between Anita Street and Giles Road in Redland Bay.

  • Metropolitan District
  • Pre-construction
No image supplied

Cunningham Highway (Ipswich – Warwick), 2020 Disaster Recovery Funding Arrangements reconstruction works

The department is committed to restoring the damaged section of the Cunningham Highway at Cunninghams Gap. This 2km stretch, leading up to the Allan Cunningham monument, suffered significant road damage during the bushfires in 2019.

  • South Coast District
  • Construction
Aerial image of Cunningham Highway at Cunninghams Gap

Currumbin Creek Road – Bienvenue Drive intersection upgrade

The intersection of Currumbin Creek Road and Bienvenue Drive, at Currumbin Waters will be upgraded.

  • South Coast District
  • Pre-construction
No image supplied

Edens Landing station precinct upgrade

Edens Landing station precinct is being upgraded as part of the Logan and Gold Coast Faster Rail project to improve accessibility, safety and customer experience.

  • South Coast District
  • Pre-construction
People walking along a path with the Edens landing station in the background.

Far North Queensland disaster recovery works

The Queensland Government has made significant progress in repairing roads damaged by Tropical Cyclone Jasper in December 2023 and the North and Far North Tropical Low in February 2025.

  • Far North District
  • Construction
Aerial image of Kuranda Range Road, showing large green trees and a curved road which has temporary stabilisation repairs following a major landslip on the side of the road.

Flood resilience works

The Queensland Government, via the Department of Transport and Main Roads (TMR), is improving the resilience of the state-controlled road network at priority sites impacted by recent severe weather events.

  • Construction

Gold Coast-Springbrook Road, Disaster Recovery Funding Arrangements reconstruction works

Gold Coast—Springbrook Road sustained a significant number of landslips, rock falls and tree falls during the South Queensland Severe Storms and Rainfall events in December 2023 and January 2024.

  • South Coast District
  • Construction
Aerial view of Gold Coast-Springbrook Road major slip site

Gympie – Brooloo Road, design active transport crossings

The Queensland Government has developed a preliminary design for active transport bridges and pathways to connect Southside to Gympie's CBD and surrounds.

  • Wide Bay Burnett District
  • Pre-construction
No image supplied

Holmview station precinct upgrade

Holmview train station is being upgraded to improve accessibility, safety and customer experience.

  • South Coast District
  • Pre-construction
Artist impression of the Holmview train station from street view looking at the new station entrance.

Kennedy Highway (Cairns - Mareeba), Barron River bridge (Kuranda), replacement

Pre-construction work has commenced to replace the ageing Barron River bridge at Kuranda to improve network reliability and safety for all road users, while minimising potential environmental and cultural heritage impacts.

  • Far North District
  • Pre-construction
Thumbnail image of bride and inspection unit

Kennedy Highway (Kuranda Range Road) cyclone reconstruction works

Significant progress has been made on restoring the Kennedy Highway (Kuranda Range Road) to its pre-event function following Tropical Cyclone Jasper in December 2023 and the North and Far North Tropical Low in February 2025.

  • Far North District
  • Construction
No image supplied

Kingston station precinct upgrade

The Kingston station precinct is being upgraded as part of the Logan and Gold Coast Faster Rail project to improve accessibility, safety and customer experience for the community.

  • South Coast District
  • Pre-construction
Artist impression of Kingston Train Station following redevelopment

Linkfield Road Overpass upgrade

The Queensland Government is committed to improving road safety, reducing congestion, and supporting the growing needs of the Bald Hills community.

  • Metropolitan District
  • Pre-construction
No image supplied

Maroochydore Road, Pike Street and Killick Street intersection upgrade, design

The department has identified a preferred option for the future upgrade of Maroochydore Road, Kunda Park to improve the existing transport network by enhancing network reliability and improving access options.

  • North Coast District
  • Pre-construction
No image supplied

Mossman – Daintree Road, 2024 Disaster Recovery Funding Arrangements reconstruction works

Reconstruction works are underway on a section of Mossman – Daintree Road damaged during ex-Tropical Cyclone Jasper.

Disaster recovery is a long-term process and involves an extensive program of works and complex solutions.

A variety of stabilising techniques will be used, including:

  • reinforcing the slopes
  • soil anchoring systems
  • vertical retention piling
  • building rock retaining walls.

These repairs will ensure the road is returned to its fully operational pre-cyclone function.

  • Far North District
  • Construction
No image supplied

Mossman – Mount Molloy Road, 2024 Disaster Recovery Funding Arrangements reconstruction works

Reconstruction works on Mossman – Mount Molloy Road are underway to repair landslip sites caused by ex-Tropical Cyclone Jasper in December 2023.

  • Far North District
  • Construction
No image supplied

Mount Spec Road reconstruction works

The Queensland Government is repairing Mount Spec Road after substantial structural damage following record rainfall in early 2025. This includes more than 60 landslips, with 6 major and 2 high-risk sites.

  • Northern District
  • Construction
No image supplied

Pialba–Burrum Heads Road, O’Regan Creek, upgrade existing floodway

This upgrade will improve flood resilience for Hervey Bay and surrounding communities and involves pavement realignment, widening, and culvert upgrades.

  • Wide Bay Burnett District
  • Pre-construction
Pialba–Burrum Heads Road, O’Regan Creek, upgrade existing floodway project location map

Ross River Road, Mabin Street to Rolfe Street, improve safety

Safety upgrades are planned for Ross River Road, between the Mabin Street and Rolfe Street intersections, under the High Risk Roads program.

  • Northern District
  • Pre-construction
No image supplied

Southern Queensland 2022 flood reconstruction works completed

Repairs have been completed across southern Queensland after extensive and severe damage to the state-controlled road network was caused by multiple heavy rainfall and flooding events in 2022.

  • Darling Downs District
  • Metropolitan District
  • North Coast District
  • South Coast District
  • Wide Bay Burnett District
  • Completed
Landslip on Gold Coast - Springbrook Road

The Wave – Stages 1 and 2 (Rail)

We’re directly connecting the eastern communities of the Sunshine Coast to South East Queensland’s passenger rail network, making it easier to travel locally and between the Sunshine Coast, Moreton Bay and Brisbane.

  • North Coast District
  • Pre-construction
No image supplied

Trinder Park station precinct upgrade

The Trinder Park station precinct is being upgraded as part of the Logan and Gold Coast Faster Rail project to improve accessibility, safety and customer experience.

  • South Coast District
  • Pre-construction
Concept render of the proposed new Trinder Park station showing the Translink logo and Trinder Park sign on the front. Image is looking from Alexander Street with people out the front of the new station building and a train pulled up at a platform.

Veloway 1 (V1) Cycleway, Birdwood Road cycle bridge and approaches

The Veloway 1 (V1) is a dedicated cycleway running between South Brisbane and Underwood. The V1 Birdwood Road velobridge will improve safety, traffic flow and network connectivity.

  • Metropolitan District
  • Pre-construction
No image supplied

Warrego Highway (Ipswich - Toowoomba) and Mount Crosby Road interchange

The department has completed planning to identify a preferred option for the upgrade of the Warrego Highway – Mount Crosby Road interchange.

  • Metropolitan District
  • Pre-construction
Warrego Highway Mount Crosby upgrade project area aerial image

Woodridge station precinct upgrade

The Woodridge station precinct is being upgraded as part of the Logan and Gold Coast Faster Rail project to improve accessibility, safety and customer experience.

  • South Coast District
  • Pre-construction
Concept render of the proposed upgraded Woodridge station showing the Translink logo and Woodridge sign on the front. Image is looking from Station Road and shows the new wider underpass with people out the front of the new station building and trains pulled up at the platforms.

Last updated: 17 March 2026