Bruce Highway (Townsville-Ingham) upgrade program

The department is undertaking concurrent upgrades to improve safety, efficiency and roadside facilities on the Bruce Highway between Townsville and Ingham.

A new northbound overtaking lane is being constructed between Leichhardt Creek and Lilypond Creek, with additional safety improvement in the nearby area through the installation of wide centre line treatment. These one-metre-wide separations between oncoming traffic lanes have been shown to greatly reduce the risk of head-on collisions.

As part of the same program of works, upgrades are also being made to the Christmas Creek rest area to install ablutions, improve turn lanes into the rest area and improve conditions for heavy vehicles.

Benefits

  • Improves safety
  • Improves network efficiency
  • Increases traffic flow
  • Better road access
  • Contributes to economy
  • Contributes to regional growth

60 Projects in Bruce Highway (Townsville-Ingham) upgrade program

Barcaldine-Aramac Road, rehabilitate and widen pavement

An additional 5km of Barcaldine-Aramac Road has been widened to improve travel conditions.

  • Central West District
  • Completed
No image supplied

Beaudesert – Nerang Road and Yalkuri Drive, upgrade intersection

Beaudesert – Nerang Road, Yalkuri Drive and Willawong Crescent intersection has been upgraded with traffic signals to improve safety and operational functionality. This also includes on-road designated and shared bicycle infrastructure.

  • Completed
The map shows the locality of the proposed Beaudesert-Nerang Road, Yalkuri Drive and Willawong Crescent intersection upgrade. Beaudesert is located to the west and Nerang to the east of the project location. A solid dark blue line indicates the project extent, which encompasses Yalkuri Drive south of the intersection and Willawong Crescent north of the intersection, as well as Beaudesert–Nerang Road, which is located west and east of the intersection. The local road network, Riverlea Waters Drive is also highlighted on the map.

Brisbane Valley Highway (Ipswich - Harlin), Warrego Highway to Fernvale, improve safety

This project involved improvements to approximately 14km of the Brisbane Valley Highway to reduce the rate and severity of crashes and improve traffic efficiency.

  • North Coast District
  • Completed

Brisbane-Beenleigh Road, Kingston Road and Compton Road, upgrade intersection

Construction is now complete for the upgrade of Brisbane-Beenleigh Road (Kingston Road) and Compton Road intersection.

  • Completed
No image supplied

Bruce Highway (Brisbane - Gympie), Caboolture - Bribie Island Road to Steve Irwin Way upgrade

Major construction was completed for the Bruce Highway Upgrade — Caboolture-Bribie Island Road to Steve Irwin Way project in April 2024. This project widened the 11km stretch of the Bruce Highway from 4 to 6 lanes between Caboolture-Bribie Island Road and Steve Irwin Way (Exit 163). This also included upgrading creek crossings to improve flood immunity at Lagoon, King Johns, Six Mile, Un-named and Beerburrum Creeks.

  • North Coast District
  • Completed
No image supplied

Bruce Highway (Cooroy to Curra) Section D

The $1.162 billion Section D: Woondum to Curra project is a new 26km, 4-lane divided highway between the existing Bruce Highway interchange at Woondum, south of Gympie and Curra.

  • Wide Bay Burnett District
  • Completed
Looking north towards an 8 span, 260 metre long concrete bridge structure over Deep Creek with construction crews on the bridge completing the final layer of pavement in preparation for linemarking. There is a bio-retention basin (like a sediment pond) in the foreground.

Bruce Highway (Rockhampton-St Lawrence), various locations, upgrade bridges

The Bruce Highway is a critical link for Queensland, connecting coastal and regional communities from Cairns to Brisbane. Safety upgrades have been completed at Twelve Mile Creek bridge and John Murphy Bridge.

  • Fitzroy District
  • Completed
No image supplied

Bruce Highway – Pine River to Caloundra Road Smart Motorways (Stage 2)

The Bruce Highway - Pine River to Caloundra Road Smart Motorways (Stage 2) project has delivered additional Smart Motorways technology along the 60km section of the Bruce Highway between the Pine River and Caloundra Road.

  • North Coast District
  • Completed
No image supplied

Bruce Highway—Cooroy to Curra

This project involved a 62km realignment and upgrade of the Bruce Highway to 4 lanes between Cooroy and Curra.

  • Wide Bay Burnett District
  • Completed
No image supplied

Caboolture - Beachmere Road, improve safety

Construction is complete on safety improvements for Caboolture – Beachmere Road (locally known as Beachmere Road) to enhance overall driving conditions.

  • North Coast District
  • Completed
No image supplied

Caboolture-Bribie Island Road, Old Toorbul Point Road to Saint Road

Construction to duplicate Caboolture-Bribie Island Road to a 4-lane, dual carriageway from Old Toorbul Point Road to just east of Saint Road has been completed. This included signalising the Volz Road/Browns Road intersection.

  • North Coast District
  • Completed
Side of Old Toorbul Point Road

Camp Cable Road and Edelsten Road, improve intersection

This intersection is identified for an upgrade due to the rapid expansion of local urban areas, increased traffic volumes and crash history.

  • South Coast District
  • Completed
Map showing safety improvement works located at the intersection of Camp Cable Road and Edelsten Road in Jimboomba. The northern side of Camp Cable Road will be widened to allow for a dedicated right turn lane into Edlesten Road, so motorists can safely wait before turning, and through-traffic can continue ahead towards Yarrabilba. Camp Cable Road will have new formalised bus stops on both sides of the road along with an extra 2 metres of shoulder width for bicycle riders.  The existing left turn lane from Camp Cable Road onto Edelsten Road will be relinemarked as a shared left turn lane to improve traffic flow. New Stop signs will be installed on Edelsten Road at the intersection replacing the existing Give Way signs.

Capricorn Highway (Duaringa–Emerald), undertake road safety improvements

The Capricorn Highway is a key freight route and supports a wide range of industries including agriculture, resources and mining. It plays an important role in connecting Rockhampton with central and western communities in Queensland.

  • Fitzroy District
  • Completed
No image supplied

Carnarvon Highway (Roma - Injune), major culvert upgrades

The Queensland Government has improved safety and network efficiency by replacing the 3 major culverts with larger structures and widening the pavement to 10m approximately 6km north of Roma.

  • South West District
  • Completed
No image supplied

Centenary Motorway (Yamanto – Ellen Grove) and Springfield Greenbank Arterial exit ramp, upgrade intersection

The department worked with Ipswich City Council to upgrade the Centenary Motorway exit ramp (Exit 32), and the Main Street and Springfield Greenbank Arterial Road intersection, to manage congestion and improve safety at the exit ramp.

  • Metropolitan District
  • Completed
No image supplied

Clump Point Mission Beach boating infrastructure project

Works were undertaken to upgrade the public boating facilities at Mission Beach Clump Point.

  • Completed
No image supplied

Cunningham Highway (Warwick – Inglewood), improve safety

The project involved upgrading infrastructure to improve safety, provide a better driving experience for all road users and reduce the risk of fatal and serious injury crashes.

  • Darling Downs District
  • Completed
No image supplied

D'Aguilar Highway (Yarraman – Kingaroy), various locations, improve safety

The Queensland Government has improved safety and traffic efficiency on 24km of the D’Aguilar Highway between Nanango and Kingaroy.

  • Wide Bay Burnett District
  • Completed
No image supplied

Gatton–Helidon Road, improve safety

Traffic flow and safety has been improved on Gatton–Helidon Road.

  • Darling Downs District
  • Completed
No image supplied

Glass House Mountains Road (Steve Irwin Way) safety improvements, between Glass House Mountains and Beerwah

This project delivered a range of treatments to improve safety along Steve Irwin Way between Glass House Mountains and Beerwah.

  • North Coast District
  • Completed
No image supplied

Isis Highway (Biggenden - Coalstoun Lakes), upgrade Biggenden railway crossing

Construction to improve the Isis Highway at Biggenden and remove the ageing timber bridge rail overpass and construct an at-grade road (a new road that will be at the same level as the existing road) is complete.

  • Wide Bay Burnett District
  • Completed
No image supplied

Kawana Motorway (Mooloolah River Interchange to Kawana Way Link Road)

Early planning is complete for a new motorway link (Kawana Motorway) between Parrearra and Meridan Plains. This new motorway will help cater for the growing population.

  • North Coast District
  • Completed
Kawana Motorway project map

Mackay Ring Road

The Mackay Ring Road to Bald Hill Road Connection Project delivers a significant upgrade to the Brue Highway.

  • Mackay Whitsunday District
  • Completed
Pioneer River crossing

Mackay – Bucasia Road, capacity upgrades and duplication planning

Planning is complete and has identified future upgrades to Mackay – Bucasia Road to improve congestion, safety, and flooding impacts on this vital link to the Northern Beaches.

  • Mackay Whitsunday District
  • Completed
No image supplied

Maryborough-Hervey Bay Road intersection upgrades and safety works – Noble Road, Stockman Way and Sunnyside Drive

The Maryborough–Hervey Bay Road intersection upgrades and safety works involved upgrading the Noble Road, Stockman Way and Sunnyside Drive intersections at Susan River to improve safety for all road users.

  • Wide Bay Burnett District
  • Completed
No image supplied

Monto–Mount Perry Road progressive sealing

The department has progressively upgraded and sealed the gravel sections of Monto–Mount Perry Road to improve road user safety and comfort and reduce future maintenance requirements. 

  • Wide Bay Burnett District
  • Completed
No image supplied

Mount Cotton Road, Duncan Road to Double Jump Road, planning study

Planning to improve safety and congestion at key intersections on Mount Cotton Road, Redland Bay Road and Redland Sub-Arterial Road is complete.

  • Metropolitan District
  • Completed
Map showing roads subject to planning including, Mount Cotton Road (Duncan Road to Double Jump Road), Redland Bay Road (Tingalpa Creek to Cleveland-Redland Bay Road), and Redland Sub-Arterial Road (Mount Gravatt-Capalaba Road to Tingalpa Creek).

Mount Lindesay Highway (Brisbane - Beaudesert), Johanna Street to South Street (Jimboomba), duplication

The Mount Lindesay Highway at Jimboomba has been upgraded to improve safety, reduce congestion and improve shared path connectivity.

  • Completed

Northgate station park 'n' ride business case

The department has completed planning which investigated expansion of parking facilities at Northgate station in response to high demand for parking in the local area.

  • Metropolitan District
  • Completed

Pacific Motorway Eight Mile Plains to Daisy Hill Upgrade (Sports Drive to Gateway Motorway Upgrade)

The Sports Drive to Gateway Motorway Upgrade was part of a rolling program of upgrades between the Gateway and Logan Motorways.

  • South Coast District
  • Completed
Aerial of Pacific Motorway looking southbound at Eight Mile Plains

Pacific Motorway Eight Mile Plains to Daisy Hill Upgrade (Watland Street to Sports Drive Upgrade)

The Pacific Motorway (M1) between Watland Street and Sports Drive was upgraded as part of a rolling program of upgrades between the Gateway and Logan motorways.

  • South Coast District
  • Completed
An aerial view of the Pacific Motorway Eight Mile Plains to Daisy Hill upgrade project.

Pacific Motorway M1 Burleigh to Palm Beach (Nineteenth Avenue)

The M1 between Burleigh and Palm Beach (Package B) has been upgraded as part of the Varsity Lakes to Tugun (VL2T) upgrade. Package B included significant environmental features through this section of the upgrade.

  • South Coast District
  • Completed
Pacific Motorway M1 Burleigh to Palm Beach Nineteenth Avenue Exit 89 Tallebudgera interchange

Pacific Motorway M1 Palm Beach (Nineteenth Avenue) to Tugun

The Pacific Motorway (M1) has been upgraded between Palm Beach and Tugun (Package C) as part of the Varsity Lakes to Tugun (VL2T) upgrade.

  • South Coast District
  • Completed
Pacific Motorway M1 Palm Beach Nineteenth Avenue to Tugun Currumbin Creek bridge

Pacific Motorway M1 Varsity Lakes to Tugun upgrade

The $1.5 billion Pacific Motorway Varsity Lakes to Tugun (VL2T) project to upgrade 10km of the M1 has been completed.

  • South Coast District
  • Completed
Aerial view of M1 at Varsity Lakes and Tugun section

Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade

Work is now complete on the Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade, which has improved 8kms of the Pacific Motorway (M1) between the Gateway Motorway and Watland Street.

  • South Coast District
  • Detailed design
An aerial view of the Pacific Motorway Eight Mile Plains to Daisy Hill upgrade project.

Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade (Pacific Highway early works upgrade)

The Pacific Highway (western service road) in Slacks Creek was realigned and upgraded as part of the Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade.

  • South Coast District
  • Completed
Aerial photo of Pacific Highway early works location

Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade (Rochedale bus station and park 'n' ride)

The Rochedale bus station and park ‘n’ ride was upgraded as part of a rolling program of upgrades between the Gateway and Logan motorways.

  • South Coast District
  • Completed
Rochedale bus station and park n ride

Pacific Motorway, Exit 49, upgrade interchange

The Exit 49 interchange upgrade has delivered significant improvements in safety and traffic flow efficiency by keeping traffic moving through the improved interchange and reducing queuing.

  • South Coast District
  • Completed
No image supplied

Redland Bay Road, Taylor Road to Cleveland Redland Bay Road, planning study

Planning to improve safety and congestion at key intersections on Mount Cotton Road, Redland Bay Road and Redland Sub-Arterial Road is complete.

  • Metropolitan District
  • Completed
Map showing roads subject to planning including, Mount Cotton Road (Duncan Road to Double Jump Road), Redland Bay Road (Tingalpa Creek to Cleveland-Redland Bay Road), and Redland Sub-Arterial Road (Mount Gravatt-Capalaba Road to Tingalpa Creek).

Redland Sub-Arterial Road, Mount Gravatt Capalaba Road to Tingalpa Creek, widening, business case (planning)

Planning to improve safety and congestion at key intersections on Mount Cotton Road, Redland Bay Road and Redland Sub-Arterial Road is complete.

  • Metropolitan District
  • Completed
Mount Cotton Road-Redland Bay Road location map

Richmond - Winton Road, strengthen and widen pavement

The Queensland Government has improved all weather access, travel reliability and safety along Richmond — Winton Road by widening and strengthening this section.

  • North West Direct
  • Completed
No image supplied

Samford Road safety improvements

The safety improvement project along Samford Road, covering a 1.5 km section between the Lomandra Access Road picnic area and Camp Mountain Road, inclusive of the intersection at Camp Mountain Road, is now complete.

  • North Coast District
  • Completed
No image supplied

Smith Street Connection Road, Olsen Avenue to Kumbari Avenue, construct cycleway

The Queensland Government has delivered new bicycle facilities to connect to local health, education, business, and tourist areas. 

  • South Coast District
  • Completed
The map shows the locality of the proposed Smith Street Connection Road, Olsen Avenue to Kumbari Avenue, construct cycleway works. Kumbari Avenue is located to the north of the project location in Southport. A solid dark blue line indicates the project extent, which encompasses Smith Street Connection Road west of the intersection and Kumbari Avenue, which is located north and south of the intersection. Village Boulevard is also highlighted on the map, west of the project location.

South Brisbane Transport and Mobility Study

We conducted a multi-modal study of the ongoing and increasing transport pressures relating to road, active transport and public transport modes in Brisbane’s inner south.

  • Metropolitan District
  • Completed
No image supplied

Southern Freight Rail Corridor Study

The Southern Freight Rail Corridor has been identified as a future route connecting the Western Rail line near Rosewood to the interstate railway north of Beaudesert. The Southern Freight Rail Corridor will serve as a major freight link connecting a future Melbourne to Brisbane Inland Rail line with the existing south-east Queensland rail freight network.

  • Completed
No image supplied

Southern Queensland 2022 flood reconstruction works completed

Repairs have been completed across southern Queensland after extensive and severe damage to the state-controlled road network was caused by multiple heavy rainfall and flooding events in 2022.

  • Darling Downs District
  • Metropolitan District
  • North Coast District
  • South Coast District
  • Wide Bay Burnett District
  • Completed
Landslip on Gold Coast - Springbrook Road

Strathpine - Samford Road (Eatons Crossing Road and Mount Samson Road), improve intersection and route safety

Construction is complete for safety improvements on Strathpine-Samford Road between Eatons Hill and Samford Valley.

  • North Coast District
  • Completed
No image supplied

Strathpine Shopping Centre bus station, upgrade

Construction is complete for the upgrade of the Strathpine Shopping Centre bus station.

  • Completed
No image supplied

Tallebudgera Connection Road Koala Zone Trial

We are deeply committed to protecting native fauna and actively support initiatives and treatments aimed at reducing koala-vehicle collisions. Recognising our responsibility to safeguard vulnerable wildlife, we prioritise measures that mitigate risks to koalas on Queensland roads.

  • South Coast District
  • Completed
No image supplied

Tin Can Bay Road and Bayside Road, construct roundabout

Construction of a new single-lane roundabout at the intersection of Tin Can Bay Road and Bayside Road at Tin Can Bay is complete.

  • Wide Bay Burnett District
  • Completed
No image supplied

Toowoomba Central Active Transport Link, business case

The Queensland Government has completed the business case for the Toowoomba Central Active Transport Link project.

  • Darling Downs District
  • Completed
No image supplied

Toowoomba to Gladstone Inland Rail Extension Strategic Business Case

The Australian and Queensland governments worked together to deliver the Toowoomba to Gladstone Inland Rail Extension Strategic Business Case.

  • Darling Downs District
  • Fitzroy District
  • Completed
Thumbnail image showing map of project area for proposed extension for Inland Rail from Toowoomba to Gladstone

Townsville Connection Road (Stuart Drive), University Road to Bowen Road bridge (Idalia), improve safety

The Queensland Government has upgraded Townsville Connection Road to improve safety, traffic flow, and connectivity between University Road and Bowen Road bridge at Idalia.

  • Northern District
  • Completed
No image supplied

Veloway 1 (V1) Cycleway, O'Keefe Street, construct cycle bridge and approaches

The O’Keefe Street velobridge at Woolloongabba is now open.

  • Metropolitan District
  • Completed
Artist impression of the Veloway 1 at O'Keefe St

Walkerston Bypass

The Walkerston Bypass is a new 2-lane rural highway connecting Peak Downs Highway west of Walkerston to the Mackay Ring Road near Paget.

  • Mackay Whitsunday District
  • Completed
No image supplied

Warrego Highway (Miles – Roma) and Wallumbilla South Road, improve intersection has been successfully completed

The project involved widening the Warrego Highway through Wallumbilla, constructing turning lanes, and implementing safety improvements.

  • South West District
  • Completed
No image supplied

Warrego Highway (Miles – Roma), pavement widening and culverts

This project involved widening a 7-kilometre section of the Warrego Highway west of Wallumbilla.

  • South West District
  • Completed
No image supplied

Yandina—Coolum Road, South Coolum Road and School Road, upgrade roundabout

Construction for a project to replace the roundabout with a signalised intersection has been completed.

  • North Coast District
  • Completed
No image supplied

Last updated: 7 November 2023