Barcaldine-Aramac Road, rehabilitate and widen pavement
An additional 5km of Barcaldine-Aramac Road has been widened to improve travel conditions.
The department is undertaking concurrent upgrades to improve safety, efficiency and roadside facilities on the Bruce Highway between Townsville and Ingham.
A new northbound overtaking lane is being constructed between Leichhardt Creek and Lilypond Creek, with additional safety improvement in the nearby area through the installation of wide centre line treatment. These one-metre-wide separations between oncoming traffic lanes have been shown to greatly reduce the risk of head-on collisions.
As part of the same program of works, upgrades are also being made to the Christmas Creek rest area to install ablutions, improve turn lanes into the rest area and improve conditions for heavy vehicles.
An additional 5km of Barcaldine-Aramac Road has been widened to improve travel conditions.
Beaudesert – Nerang Road, Yalkuri Drive and Willawong Crescent intersection has been upgraded with traffic signals to improve safety and operational functionality. This also includes on-road designated and shared bicycle infrastructure.
This project involved improvements to approximately 14km of the Brisbane Valley Highway to reduce the rate and severity of crashes and improve traffic efficiency.
Construction is now complete for the upgrade of Brisbane-Beenleigh Road (Kingston Road) and Compton Road intersection.
Major construction was completed for the Bruce Highway Upgrade — Caboolture-Bribie Island Road to Steve Irwin Way project in April 2024. This project widened the 11km stretch of the Bruce Highway from 4 to 6 lanes between Caboolture-Bribie Island Road and Steve Irwin Way (Exit 163). This also included upgrading creek crossings to improve flood immunity at Lagoon, King Johns, Six Mile, Un-named and Beerburrum Creeks.
The $1.162 billion Section D: Woondum to Curra project is a new 26km, 4-lane divided highway between the existing Bruce Highway interchange at Woondum, south of Gympie and Curra.
The Bruce Highway is a critical link for Queensland, connecting coastal and regional communities from Cairns to Brisbane. Safety upgrades have been completed at Twelve Mile Creek bridge and John Murphy Bridge.
The Bruce Highway - Pine River to Caloundra Road Smart Motorways (Stage 2) project has delivered additional Smart Motorways technology along the 60km section of the Bruce Highway between the Pine River and Caloundra Road.
This project involved a 62km realignment and upgrade of the Bruce Highway to 4 lanes between Cooroy and Curra.
Construction is complete on safety improvements for Caboolture – Beachmere Road (locally known as Beachmere Road) to enhance overall driving conditions.
Construction to duplicate Caboolture-Bribie Island Road to a 4-lane, dual carriageway from Old Toorbul Point Road to just east of Saint Road has been completed. This included signalising the Volz Road/Browns Road intersection.
This intersection is identified for an upgrade due to the rapid expansion of local urban areas, increased traffic volumes and crash history.
The Capricorn Highway is a key freight route and supports a wide range of industries including agriculture, resources and mining. It plays an important role in connecting Rockhampton with central and western communities in Queensland.
The Queensland Government has improved safety and network efficiency by replacing the 3 major culverts with larger structures and widening the pavement to 10m approximately 6km north of Roma.
The department worked with Ipswich City Council to upgrade the Centenary Motorway exit ramp (Exit 32), and the Main Street and Springfield Greenbank Arterial Road intersection, to manage congestion and improve safety at the exit ramp.
Works were undertaken to upgrade the public boating facilities at Mission Beach Clump Point.
The project involved upgrading infrastructure to improve safety, provide a better driving experience for all road users and reduce the risk of fatal and serious injury crashes.
The Queensland Government has improved safety and traffic efficiency on 24km of the D’Aguilar Highway between Nanango and Kingaroy.
Traffic flow and safety has been improved on Gatton–Helidon Road.
This project delivered a range of treatments to improve safety along Steve Irwin Way between Glass House Mountains and Beerwah.
Construction to improve the Isis Highway at Biggenden and remove the ageing timber bridge rail overpass and construct an at-grade road (a new road that will be at the same level as the existing road) is complete.
Early planning is complete for a new motorway link (Kawana Motorway) between Parrearra and Meridan Plains. This new motorway will help cater for the growing population.
The Mackay Ring Road to Bald Hill Road Connection Project delivers a significant upgrade to the Brue Highway.
Planning is complete and has identified future upgrades to Mackay – Bucasia Road to improve congestion, safety, and flooding impacts on this vital link to the Northern Beaches.
The Maryborough–Hervey Bay Road intersection upgrades and safety works involved upgrading the Noble Road, Stockman Way and Sunnyside Drive intersections at Susan River to improve safety for all road users.
The department has progressively upgraded and sealed the gravel sections of Monto–Mount Perry Road to improve road user safety and comfort and reduce future maintenance requirements.
Planning to improve safety and congestion at key intersections on Mount Cotton Road, Redland Bay Road and Redland Sub-Arterial Road is complete.
The Mount Lindesay Highway at Jimboomba has been upgraded to improve safety, reduce congestion and improve shared path connectivity.
The department has completed planning which investigated expansion of parking facilities at Northgate station in response to high demand for parking in the local area.
The Sports Drive to Gateway Motorway Upgrade was part of a rolling program of upgrades between the Gateway and Logan Motorways.
The Pacific Motorway (M1) between Watland Street and Sports Drive was upgraded as part of a rolling program of upgrades between the Gateway and Logan motorways.
The M1 between Burleigh and Palm Beach (Package B) has been upgraded as part of the Varsity Lakes to Tugun (VL2T) upgrade. Package B included significant environmental features through this section of the upgrade.
The Pacific Motorway (M1) has been upgraded between Palm Beach and Tugun (Package C) as part of the Varsity Lakes to Tugun (VL2T) upgrade.
The $1.5 billion Pacific Motorway Varsity Lakes to Tugun (VL2T) project to upgrade 10km of the M1 has been completed.
Work is now complete on the Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade, which has improved 8kms of the Pacific Motorway (M1) between the Gateway Motorway and Watland Street.
The Pacific Highway (western service road) in Slacks Creek was realigned and upgraded as part of the Pacific Motorway, Eight Mile Plains to Daisy Hill Upgrade.
The Rochedale bus station and park ‘n’ ride was upgraded as part of a rolling program of upgrades between the Gateway and Logan motorways.
The Exit 49 interchange upgrade has delivered significant improvements in safety and traffic flow efficiency by keeping traffic moving through the improved interchange and reducing queuing.
Planning to improve safety and congestion at key intersections on Mount Cotton Road, Redland Bay Road and Redland Sub-Arterial Road is complete.
Planning to improve safety and congestion at key intersections on Mount Cotton Road, Redland Bay Road and Redland Sub-Arterial Road is complete.
The Queensland Government has improved all weather access, travel reliability and safety along Richmond — Winton Road by widening and strengthening this section.
The safety improvement project along Samford Road, covering a 1.5 km section between the Lomandra Access Road picnic area and Camp Mountain Road, inclusive of the intersection at Camp Mountain Road, is now complete.
The Queensland Government has delivered new bicycle facilities to connect to local health, education, business, and tourist areas.
We conducted a multi-modal study of the ongoing and increasing transport pressures relating to road, active transport and public transport modes in Brisbane’s inner south.
The Southern Freight Rail Corridor has been identified as a future route connecting the Western Rail line near Rosewood to the interstate railway north of Beaudesert. The Southern Freight Rail Corridor will serve as a major freight link connecting a future Melbourne to Brisbane Inland Rail line with the existing south-east Queensland rail freight network.
Repairs have been completed across southern Queensland after extensive and severe damage to the state-controlled road network was caused by multiple heavy rainfall and flooding events in 2022.
Construction is complete for safety improvements on Strathpine-Samford Road between Eatons Hill and Samford Valley.
Construction is complete for the upgrade of the Strathpine Shopping Centre bus station.
We are deeply committed to protecting native fauna and actively support initiatives and treatments aimed at reducing koala-vehicle collisions. Recognising our responsibility to safeguard vulnerable wildlife, we prioritise measures that mitigate risks to koalas on Queensland roads.
Construction of a new single-lane roundabout at the intersection of Tin Can Bay Road and Bayside Road at Tin Can Bay is complete.
The Queensland Government has completed the business case for the Toowoomba Central Active Transport Link project.
The Australian and Queensland governments worked together to deliver the Toowoomba to Gladstone Inland Rail Extension Strategic Business Case.
The Queensland Government has upgraded Townsville Connection Road to improve safety, traffic flow, and connectivity between University Road and Bowen Road bridge at Idalia.
The O’Keefe Street velobridge at Woolloongabba is now open.
The Walkerston Bypass is a new 2-lane rural highway connecting Peak Downs Highway west of Walkerston to the Mackay Ring Road near Paget.
The project involved widening the Warrego Highway through Wallumbilla, constructing turning lanes, and implementing safety improvements.
This project involved widening a 7-kilometre section of the Warrego Highway west of Wallumbilla.
Construction for a project to replace the roundabout with a signalised intersection has been completed.
Last updated: 7 November 2023