Coomera Connector Stage 1, Coomera to Nerang
Stage 1 of the Coomera Connector, between Coomera and Nerang, is around 16km and is now open to traffic between Shipper Drive and Helensvale Road.
Construction
Stage 1 of the Coomera Connector, between Coomera and Nerang, is around 16km and is now open to traffic between Shipper Drive and Helensvale Road.
Construction
Coomera Connector (Future Stages), between Loganholme and Coomera, is around 29km and will connect with Coomera Connector Stage 1.
Planning
Stage 2 of the Coomera Connector, between Pimpama and Coomera, is around 5km and is the next priority section for planning and design.
PlanningThe Coomera Connector (M9) is a 45km north-south future motorway between Loganholme and Nerang, east of the Pacific Motorway (M1) and heavy rail line.
The new motorway will be an alternative to the M1, and support the rapidly growing residential and business communities in the northern Gold Coast and neighbouring Logan areas.
The full corridor extends between the Logan Motorway and Pacific Motorway interchange in Loganholme and Nerang–Broadbeach Road in Nerang.
The Coomera Connector is being delivered progressively:
The Coomera Connector will be a key link between Loganholme and the Gold Coast, where residential and business communities are growing rapidly.
Since the 1990s, the corridor has been identified in various public planning documents, such as published street directories, regional transport plans, planning studies and City of Gold Coast planning schemes. A joint 2015 study between the Queensland Government and City of Gold Coast confirmed the corridor as a future strategic transport link that will relieve traffic congestion on the M1 and surrounding local roads.
The Coomera Connector was formally declared a future state-controlled road, confirmed in the Queensland Government Gazette in 3 sections, the:
Three locations have since been identified for corridor amendments to improve outcomes and reduce environmental impacts. These locations are the crossing of the Logan River in Eagleby, Kerkin Road North in Pimpama and Foxwell Road in Coomera.
The changed alignment in Coomera and Eagleby was re-gazetted on 27 June 2025, with the Pimpama corridor amendment to be considered in upcoming phases of the project.
Formal confirmation of the corridor in the Queensland Government Gazette allows the corridor to be protected from new development and provides certainty for property owners, businesses and residential communities on the northern Gold Coast.
Our team continues to liaise with property owners when dealing with land sales and development applications. Early acquisition of properties by the Queensland Government may occur in some circumstances.
Initial community consultation on the Coomera Connector was undertaken in late 2019.
The consultation program included a series of 10 community drop-in sessions along the 45km project corridor, plus online engagement activities.
There was significant interest from the community with 3200 visits to the website, more than 2000 people visiting the community drop-in sessions, and 700 pieces of feedback received.
A telephone survey of 1000 residents and businesses revealed 4 out of 5 people in the project corridor area support the introduction of the Coomera Connector.
Read the Coomera Connector 2019 community consultation summary.
Further consultation on the whole corridor was carried out in late 2020 and early 2021.
Stage 1 consultation occurred in March 2023 (North package), November 2023 (South package), March 2024 (Central package) and March 2025 (Stage 1 corridor).
Read more about community consultation for Coomera Connector (Stage 1) and Coomera Connector (Future stages) projects.
Planning works are being finalised to upgrade and expand the southern side of the park 'n' ride at Bald Hills station.
We have investigated safety and congestion improvements for the Banyo level crossing precinct.
The Beams Road rail level crossing project will reduce congestion and address safety concerns. The current rail level crossing on Beams Road will be replaced with an overpass to separate road and rail.
The Queensland Government is delivering the design for an upgraded link for bicycle riders and pedestrians between Kurilpa Bridge and Victoria Bridge on the Bicentennial Bikeway.
The department has completed design of a new rail overpass to reduce congestion and address safety concerns at Boundary Road (Coopers Plains) rail level crossing.
The Queensland Government is upgrading the Bruce Highway, where it joins the Gateway Motorway and Gympie Arterial Road, south of the Pine River to improve traffic flow and safety.
The Queensland Government is upgrading the Bruce Highway (Brisbane-Gympie), Gateway Motorway to Dohles Rocks Road in stages to improve traffic flow and safety.
The Cannon Hill Shopping Centre bus facility is proposed to be upgraded.
The Centenary Bridge Upgrade in Jindalee will upgrade the river crossing from 4 to 6 lanes by building a new 3-lane northbound bridge and rehabilitating the existing bridges to 3 lanes southbound.
The department is undertaking a range of planning activities on the Centenary Motorway between Darra and Yamanto.
The department worked with Ipswich City Council to upgrade the Centenary Motorway exit ramp (Exit 32), and the Main Street and Springfield Greenbank Arterial Road intersection, to manage congestion and improve safety at the exit ramp.
The department is developing a masterplan to upgrade the Centenary Motorway corridor between Darra and Toowong. This initiative aims to improve safety, travel times and meet growing transport needs.
The department is improving public transport access and efficiency in Brisbane's northern corridor with the Chermside Bus Layover.
We're upgrading Cleveland-Redland Bay Road, between Anita Street and Giles Road in Redland Bay.
The department is undertaking a $110 million package of works to upgrade Cleveland-Redland Bay Road.
Coomera Connector (Future Stages), between Loganholme and Coomera, is around 29km and will connect with Coomera Connector Stage 1.
Stage 2 of the Coomera Connector, between Pimpama and Coomera, is around 5km and is the next priority section for planning and design.
Stage 1 Central of the Coomera Connector is the 8km section from Helensvale Road to Smith Street Motorway.
Stage 1 North of the Coomera Connector is the 4km section from Shipper Drive to Helensvale Road.
Stage 1 South of the Coomera Connector is the 4km section from Smith Street Motorway to Nerang-Broadbeach Road.
Stage 1 of the Coomera Connector, between Coomera and Nerang, is around 16km and is now open to traffic between Shipper Drive and Helensvale Road.
We are investigating safety, accessibility and congestion improvements for the Coorparoo level crossing precinct.
The department is undertaking planning for the remaining sections of the Ipswich Motorway between Rocklea and Darra.
Detailed planning is progressing for an interim safety upgrade and long-term solution for the Cunningham Highway and Ipswich–Rosewood Road intersection in Amberley.
Planning is underway for the upgrade of the Cunningham Highway between Dinmore and Mutdapilly, including Ripley Road and Swanbank Road interchanges.
Planning is underway to upgrade the Cunningham Highway.
Planning is progressing to improve access and create a sense of arrival to North Stradbroke Island (Minjerribah) by upgrading the ferry terminal at Junner Street, Dunwich (Gumpi).
The Eastern Transitway will provide bus customers in Brisbane's east with a safer and more efficient public transport network. The project will deliver targeted bus priority measures to improve safety, reliability, and capacity along Old Cleveland Road from Coorparoo to Carindale.
The Queensland Government is upgrading the Gateway Motorway from Bracken Ridge to the Pine River to improve traffic flow and safety.
Detailed design has started for future expansion of parking facilities at Gaythorne station.
This upgrade is part of the Queensland Government's commitment to improving road safety and traffic flow in the metropolitan region. This project aims to address congestion and enhance safety for all road users.
The Gympie Road Planning Program aims to improve travel from Herston to Carseldine and help prepare Brisbane for the 2032 Olympic and Paralympic Games.
We’re developing a new transport plan for western Brisbane to address traffic congestion, ensure public transport is accessible and reliable, and improve pedestrian and cyclist safety.
We have finalised the Ipswich to Springfield Public Transport Corridor Preliminary Evaluation.
A study has been undertaken to investigate a bypass at Fig Tree Pocket using the existing preserved corridor.
We are working with all levels of government to improve safety and accessibility at the Lindum Station and level crossing.
The Queensland Government is committed to improving road safety, reducing congestion, and supporting the growing needs of the Bald Hills community.
The Manly State Boat Harbour is an integral part of the bayside’s social, cultural and economic landscape. We are currently undertaking a master planning process to help guide future activities at the boat harbour.
Planning to improve active transport infrastructure and safety on Moggill Road between the Centenary Motorway and Kilkivan Avenue, Kenmore is now complete.
In 2021, an upgrade was proposed for the Kenmore roundabout at the intersection of Moggill Road and Brookfield Road in Kenmore. The upgrade proposed removing the roundabout and signalising the intersection, and also included provision for active transport users.
Planning is underway for safety improvements at the intersections of Moggill Road and Brookfield Road and Moggill Road and Kenmore Road, Kenmore.
Planning has been completed to upgrade active transport facilities on Moggill Road, between Witton Road and the Centenary Motorway off-ramp.
Planning to improve safety and congestion at key intersections on Mount Cotton Road, Redland Bay Road and Redland Sub-Arterial Road is complete.
The department is undertaking planning to progressively upgrade the Beaudesert Road corridor, from the Logan Motorway towards Compton Road.
Albion train station will be rebuilt and upgraded to support future interchange demand in Brisbane's inner north.
The Next Generation Traffic Signalling Program is an initiative aimed at transforming traffic signal infrastructure across Queensland.
The department has completed planning which investigated expansion of parking facilities at Northgate station in response to high demand for parking in the local area.
The Australian and Queensland governments are investigating improved freight connectivity to the Port of Brisbane.
Planning to improve safety and congestion at key intersections on Mount Cotton Road, Redland Bay Road and Redland Sub-Arterial Road is complete.
Planning to improve safety and congestion at key intersections on Mount Cotton Road, Redland Bay Road and Redland Sub-Arterial Road is complete.
In April 2019, Fulton Hogan and RoadTek were awarded 5-year contracts to undertake responsive maintenance and road asset management services across the Metropolitan Region.
We are planning for future transport needs between Salisbury and Beaudesert.
Initial community consultation was undertaken on proposed safety and traffic improvement works at key intersections along Samford Road, at Glen Holm Street and Osborne Road.
We conducted a multi-modal study of the ongoing and increasing transport pressures relating to road, active transport and public transport modes in Brisbane’s inner south.
Repairs have been completed across southern Queensland after extensive and severe damage to the state-controlled road network was caused by multiple heavy rainfall and flooding events in 2022.
The Queensland Government is planning an upgrade of the Stafford Road and South Pine Road intersection at Everton Park.
The Australian and Queensland governments have worked together to deliver the Toowoomba to Brisbane Passenger Rail Strategic Business Case.
The Veloway 1 (V1) is a dedicated cycleway running between South Brisbane and Underwood. The V1 Birdwood Road velobridge will improve safety, traffic flow and network connectivity.
The O’Keefe Street velobridge at Woolloongabba is now open.
The Veloway 1 (V1) is a dedicated bikeway designed to connect people riding bikes between Lower River Terrace, South Brisbane and Eight Mile Plains, adjacent to the Pacific Motorway.
The Veloway 1 is a dedicated cycleway running between Lower River Terrace, South Brisbane and Slacks Creek. The 20km cycleway provides a safe and efficient route for bike riders.
The department has completed planning to identify a preferred option for the upgrade of the Warrego Highway – Mount Crosby Road interchange.
The Bremer River Bridge project involves critical rehabilitation works to extend the life of the existing westbound bridge, and enable removal of the speed restrictions currently in place.
The Western Brisbane Transport Network Strategy provided a transport vision for developing a fully integrated transport network for western and north-western Brisbane that caters for walking, cycling, rail, bus, roads and freight.
Last updated: 10 January 2025