Natural Disaster Program

The department is working on about 1300 projects to restore roads across Queensland damaged by floods and bushfires. The department is also reconnecting communities and supporting regional economic recovery after disaster events damaged the state-controlled road network in 2020–26.

Key features

  • Restoring access for communities and businesses. 
  • Restoring damaged roads and road surfaces.
  • Repairing damaged structures, including bridges and culverts.
  • Repairing damaged slopes and batters along roads.
  • Clearing silt and debris.

Benefits

  • Restores damaged infrastructure
  • Contributes to economy
  • Contributes to regional growth

About the program

  • The Natural Disaster Program reconnects Queenslanders by repairing parts of the state-controlled road network damaged by natural disasters.
  • The department restores damaged sites to their pre-disaster level of service.
  • In the first 3 months after disaster events, the department undertakes emergency works such as clearing debris and filling potholes. This enables roads to be used safely while the department completes geotechnical and environmental investigations, surveys and detailed design for reconstruction works, where required.
  • Reconstruction works are completed within 2 financial years after the financial year in which the disaster event occurred.
  • Where possible, the program also supports the resilience of state roads to future disasters.

Current status

  • Damage assessments and emergency works are underway following Ex-Tropical Cyclone Koji and monsoonal rainfall across the northern two-thirds of Queensland from late December 2025 to early 2026.
  • Damage assessments and emergency works are underway following monsoonal flooding affecting the northern two-thirds of Queensland in early 2025.
  • Repairs are underway after record-breaking flooding in March and April 2025 caused widespread damage to western Queensland roads.
  • Following TC Alfred in March 2025, geotechnical investigations and procurement for design are underway for multiple major landslip sites on Gold Coast and Sunshine Coast hinterland roads.
  • A major reconstruction program is underway after significant flooding in north Queensland in early 2025, including on Mount Spec Road north-west of Townsville.
  • Substantial progress has been made on road repairs after significant disaster events in 2023–24, including Tropical Cyclone Jasper in far north Queensland, severe storms across southern Queensland and flooding associated with Tropical Cyclone Kirrily in western Queensland.
  • Repairs have been completed after flooding across northern and central Queensland in early 2023.
  • A substantial recovery program has been completed across southern Queensland, after major disaster events caused extensive damage in 2021–22.
  • Substantial progress has been made on reconstruction works on the Cunningham Highway where bushfires caused significant slope damage at Cunninghams Gap in late 2019.
Funding

The recovery works are jointly funded by the Australian and Queensland Governments through the Disaster Recovery Funding Arrangements (DRFA).

Traffic info

These works may change traffic conditions that impact your travel. Visit QLDTraffic to plan your journey.

79 Projects in Natural Disaster Program

Beerburrum Road, Twin View Road and English Street, intersection upgrade

The intersection of Beerburrum Road, Twin View Road, and English Street in Elimbah is being upgraded as part of the Queensland Government's Targeted Road Safety Program. The upgrade will include the installation of traffic signals to improve safety and provide safer turning movements and crossing opportunities for all road users.

  • North Coast District
  • Detailed design
No image supplied

Beerburrum to Nambour Rail Upgrade (Stage 1)

The Beerburrum to Nambour (B2N) Rail Upgrade (Stage 1) project will increase the capacity and reliability of the North Coast Line, enabling more efficient travel and improved passenger and freight connections between the Sunshine Coast, Moreton Bay, Brisbane and beyond.

  • North Coast District
  • Construction
 The North Coast Line meanders through the Glass House Mountains

Beerburrum to Nambour Rail Upgrade, duplication study

The Beerburrum to Nambour Rail Upgrade Duplication Study will investigate the long-term infrastructure and operational needs of the North Coast Line.

  • North Coast District
  • Planning
Aerial view of the Beerburrum to Nambour rail line

Brisbane Valley Highway (Ipswich - Harlin), Warrego Highway to Fernvale, improve safety

This project involved improvements to approximately 14km of the Brisbane Valley Highway to reduce the rate and severity of crashes and improve traffic efficiency.

  • North Coast District
  • Completed

Brisbane Valley Highway (Ipswich – Harlin), Fernvale, upgrade pedestrian facilities

Dedicated right-turn lanes, pedestrian refuges, reduced speed limits, and town entry treatments will improve safety for road users through Main Street in Fernvale.

  • North Coast District
No image supplied

Brisbane Valley Highway overtaking lanes

Planning is complete for a northbound and a southbound overtaking lane along the Brisbane Valley Highway between Fernvale and Esk.

  • North Coast District
  • Planning
No image supplied

Brisbane Valley Highway pavement strengthening

The Brisbane Valley Highway pavement strengthening project will improve ride quality for motorists.

  • North Coast District
  • Construction
Road with trees on either side with cloudy blue sky.

Brisbane Valley Highway safety upgrades

Planning is now underway for the next phase of upgrades to improve safety along the Brisbane Valley Highway.

  • North Coast District
  • Planning
Aerial view of the Brisbane Valley Highway and surrounding area.

Brisbane Valley Highway upgrade intersections

The Brisbane Valley Highway upgrade intersections project is part of the South East Queensland (SEQ) City Deal—an agreement between the Australian Government, Queensland Government, and Somerset Regional Council. This project aims to enhance connectivity and safety along the Brisbane Valley Highway, a critical freight and commuter corridor linking Somerset with Greater SEQ.

With increasing traffic volumes, the highway has seen a rise in intersection crashes. This project will deliver targeted safety improvements to reduce crash risks, improve traffic flow, and support the region’s long-term growth and connectivity.

  • North Coast District
  • Detailed design
Road with a green sign with an arrow and Toogoolawah in white writing and trees and building on the right hand side of the image.

Brisbane to Sunshine Coast Rail Corridor Strategy

We are developing a rail corridor vision and a staged program of rail priorities to 2051 on the North Coast Line between Brisbane and Gympie North.

  • North Coast District
  • Planning
No image supplied

Brisbane – Woodford Road (Mount Mee Road), Dayboro to D’Aguilar, planning

The Queensland Government is undertaking planning to identify and prioritise potential future upgrade locations for Mount Mee Road.

  • North Coast District
  • Planning
No image supplied

Bruce Highway (Brisbane - Gympie), Anzac Avenue to Uhlmann Road upgrade, business case

An upgrade is planned for the Bruce Highway from Anzac Avenue, North Lakes to Uhlmann Road, Burpengary.

  • North Coast District
  • Planning
Aerial view of Anzac Avenue to Uhlmann Road

Bruce Highway (Brisbane - Gympie), Buchanan Road to Caboolture-Bribie Island Road upgrade, business case

An upgrade is planned for the Bruce Highway from Buchanan Road, Morayfield to Caboolture-Bribie Island Road, Caboolture.

  • North Coast District
  • Planning
Aerial view of Buchannan Road to Caboolture-Bribie Island Road

Bruce Highway (Brisbane - Gympie), Caboolture - Bribie Island Road to Steve Irwin Way upgrade

Major construction was completed for the Bruce Highway Upgrade — Caboolture-Bribie Island Road to Steve Irwin Way project in April 2024. This project widened the 11km stretch of the Bruce Highway from 4 to 6 lanes between Caboolture-Bribie Island Road and Steve Irwin Way (Exit 163). This also included upgrading creek crossings to improve flood immunity at Lagoon, King Johns, Six Mile, Un-named and Beerburrum Creeks.

  • North Coast District
  • Completed
No image supplied

Bruce Highway (Brisbane - Gympie), Gateway Motorway to Dohles Rocks Road upgrade (Stage 1)

The Queensland Government is upgrading the Bruce Highway, where it joins the Gateway Motorway and Gympie Arterial Road, south of the Pine River to improve traffic flow and safety.

  • Metropolitan District
  • North Coast District
  • Detailed design
Aerial view of road, trees, cars and houses

Bruce Highway (Brisbane - Gympie), Gateway Motorway to Dohles Rocks Road upgrade (Stage 2), detailed design

The Queensland Government is upgrading the Bruce Highway (Brisbane-Gympie), Gateway Motorway to Dohles Rocks Road in stages to improve traffic flow and safety.

  • Metropolitan District
  • North Coast District
  • Detailed design

Bruce Highway (Brisbane - Gympie), Uhlmann Road to Buchanan Road upgrade, business case

An upgrade is planned for the Bruce Highway from Uhlmann Road, Burpengary to Buchanan Road, Morayfield.

  • North Coast District
  • Planning
Aerial view of Uhlmann Road to Buchanan Road

Bruce Highway (Brisbane-Gympie), Dohles Rocks Road to Anzac Avenue upgrade (Stage 1)

The department is delivering staged upgrades to manage increasing traffic demands on this section of the Bruce Highway. Stage 1 includes extended north-facing ramps from Dohles Rocks Road to Anzac Avenue.

  • North Coast District
  • Construction
Artist’s impression of the extended north-facing ramps at Dohles Rocks Road interchange on the Bruce Highway, looking north.

Bruce Highway (Pine River - Cairns), Road Operations Improvements

This project has been completed and provides Intelligent Transport System infrastructure at various locations along the Bruce Highway between Pine River and Cairns.

  • Far North District
  • Fitzroy District
  • Mackay Whitsunday District
  • North Coast District
  • Northern District
  • Wide Bay Burnett District
No image supplied

Bruce Highway – Pine River to Caloundra Road Smart Motorways (Stage 2)

The Bruce Highway - Pine River to Caloundra Road Smart Motorways (Stage 2) project has delivered additional Smart Motorways technology along the 60km section of the Bruce Highway between the Pine River and Caloundra Road.

  • North Coast District
  • Completed
No image supplied

Bulloo Developmental Road (Cunnamulla – Thargomindah), Paroo River bridge replacement

The Queensland Government is committed to building back better and ensuring the state-controlled road network is more resilient to future disasters, safeguarding communities and supporting economic recovery.

  • South West District
  • Detailed design
No image supplied

Burpengary – Caboolture Road (Morayfield Road), Aquatic Centre Drive to Graham Road, planning

Early planning is underway to investigate a future upgrade to the last remaining 2-lane section of Morayfield Road from Aquatic Centre Drive to Graham Road.

  • North Coast District
  • Planning
No image supplied

Caboolture - Beachmere Road, improve safety

Construction is complete on safety improvements for Caboolture – Beachmere Road (locally known as Beachmere Road) to enhance overall driving conditions.

  • North Coast District
  • Completed
No image supplied

Caboolture-Bribie Island Road, Hickey Road to King Johns Creek

Design is progressing for the future duplication of Caboolture-Bribie Island Road from west of Hickey Road to west of King Johns Creek. The project includes signalising the Hickey Road intersection.

  • North Coast District
  • Detailed design
Hickey Road

Caboolture-Bribie Island Road, Old Toorbul Point Road to Saint Road

Construction to duplicate Caboolture-Bribie Island Road to a 4-lane, dual carriageway from Old Toorbul Point Road to just east of Saint Road has been completed. This included signalising the Volz Road/Browns Road intersection.

  • North Coast District
  • Completed
Side of Old Toorbul Point Road

Caboolture-Dakabin train station access study

The Caboolture-Dakabin Station Access Study seeks to improve access to and around Caboolture, Morayfield, Burpengary, Narangba and Dakabin train stations.

  • North Coast District
  • Planning
No image supplied

Caboolture–Bribie Island Road, Bribie Island bridge, design and early works

A business case has been completed, and the project is now progressing through the detailed design phase for the new Bribie Island Bridge

  • North Coast District
  • Detailed design
Image: Artist’s impression of the proposed concept design for a new bridge with 2 eastbound traffic lanes and active transport located north of the existing bridge with 2 westbound traffic lanes on the existing bridge.

Caloundra Road, Kawana Way Link Road and Bells Creek Arterial Road intersection

The Queensland Government is progressing with a major upgrade of the Caloundra Road, Kawana Way Link Road, and Bells Creek Arterial Road intersection to deliver significant congestion relief and safety improvements for the Sunshine Coast region.

  • North Coast District
  • Detailed design
Caloundra Road, Kawana Way Link Road and Bells Creek Arterial Road intersection

Caloundra Road, Kawana Way Link Road to Bruce Highway, off-road cycle link, planning

The department has started planning for an off-road cycle link along approximately 3.5km of Caloundra Road.

  • North Coast District
  • Planning
No image supplied

Caloundra Road, Nicklin Way, Pelican Waters Boulevard intersection

The Queensland Government is undertaking planning to determine possible upgrade options to the Caloundra Road, Nicklin Way and Pelican Waters Boulevard intersection to increase safety, reduce congestion, and improve active transport facilities and connectivity.

  • North Coast District
  • Planning
Caloundra Road and Nicklin Way intersection

Captain Cook Highway Cairns – Mossman 2024 Disaster Recovery Funding Arrangements reconstruction

The Captain Cook Highway is undergoing extensive reconstruction to address the significant damage caused by Tropical Cyclone Jasper in December 2023.

  • Far North District
  • Construction
No image supplied

Coominya Connection Road, Buaraba Creek, replace timber bridge

The Buaraba Creek timber bridge replacement project will improve safety and network reliability by replacing the existing narrow, timber bridge (Neithe Bridge) with a new wider, two-lane, concrete structure in the same location.

  • North Coast District
  • Detailed design
No image supplied

Cooroy intersection improvements

The Queensland Government is committed to improving safety, traffic flow, and active transport options at the intersections of Diamond and Elm Streets and Myall and Elm Streets in Cooroy.

  • North Coast District
  • Planning

Cunningham Highway (Ipswich – Warwick), 2020 Disaster Recovery Funding Arrangements reconstruction works

The department is committed to restoring the damaged section of the Cunningham Highway at Cunninghams Gap. This 2km stretch, leading up to the Allan Cunningham monument, suffered significant road damage during the bushfires in 2019.

  • South Coast District
  • Construction
Aerial image of Cunningham Highway at Cunninghams Gap

Dayboro Road link study

Planning is now complete to develop a long-term vision for the future of Brisbane-Woodford Road (known as Dayboro Road) between Gympie Road and Youngs Crossing Road.

  • North Coast District
  • Planning
View of Dayboro Road looking south

Deception Bay, Bay Avenue and Moreton Downs Drive intersection, safety improvements

Safety improvements to the intersection of Deception Bay, Bay Avenue and Moreton Downs Drive intersection, Deception Bay.

  • North Coast District
  • Detailed design
No image supplied

East-West Link, Aura Boulevard to Pelican Waters Boulevard, planning

Early planning is underway to investigate a future road from Aura Boulevard to Pelican Waters Boulevard in Caloundra West. 

  • North Coast District
No image supplied

Far North Queensland cyclone reconstruction works

Significant progress has been made in restoring roads damaged by Tropical Cyclone Jasper in December 2023.

The cyclone caused severe damage to the state-controlled road network due to record rainfall.

  • Far North District
  • Construction
Aerial image of Kuranda Range Road, showing large green trees and a curved road which has temporary stabilisation repairs following a major landslip on the side of the road.

Flood resilience works

The Queensland Government, via the Department of Transport and Main Roads (TMR), is improving the resilience of the state-controlled road network at priority sites impacted by recent severe weather events.

  • Construction

Glass House Mountains Road (Steve Irwin Way) and Caloundra Street intersection upgrade

Construction is complete for safety improvements to the Glass House Mountains Road (known locally as Steve Irwin Way) and Caloundra Street intersection, Landsborough.

  • North Coast District
  • Construction
No image supplied

Glass House Mountains Road (Steve Irwin Way) safety improvements, between Glass House Mountains and Beerwah

This project delivered a range of treatments to improve safety along Steve Irwin Way between Glass House Mountains and Beerwah.

  • North Coast District
  • Completed
No image supplied

Gold Coast-Springbrook Road, Disaster Recovery Funding Arrangements reconstruction works

Gold Coast—Springbrook Road sustained a significant number of landslips, rock falls and tree falls during the South Queensland Severe Storms and Rainfall events in December 2023 and January 2024.

  • South Coast District
  • Construction
Aerial view of Gold Coast-Springbrook Road major slip site

Kawana Motorway (Mooloolah River Interchange to Kawana Way Link Road)

Early planning is complete for a new motorway link (Kawana Motorway) between Parrearra and Meridan Plains. This new motorway will help cater for the growing population.

  • North Coast District
  • Completed
Kawana Motorway project map

Kennedy Highway (Kuranda Range Road) cyclone reconstruction works

Significant progress has been made on restoring the Kennedy Highway (Kuranda Range Road) to its pre-event function following Tropical Cyclone Jasper in December 2023 and the North and Far North Tropical Low in February 2025.

  • Far North District
  • Construction
No image supplied

Kin Kin Road, strengthen and widen pavement

Design to rehabilitate and widen priority sections of Kin Kin Road (locally known as Pomona Kin Kin Road) is progressing. This will improve safety and ride quality and reduce maintenance costs.

  • North Coast District
  • Detailed design
No image supplied

Landsborough to Nambour Rail Corridor Study

We have identified and preserved a new rail corridor between Landsborough and Nambour, which will replace the existing North Coast line through this section.

  • North Coast District
  • Planning
No image supplied

Maroochydore - Noosa Road (David Low Way), Bli Bli Bridge upgrade, planning

Planning for a future upgrade of Bli Bli bridge has proposed a new bridge to the north of the existing bridge.

Key features include a wider bridge deck with two lanes of traffic (one in each direction), road shoulders and dedicated active transport facilities.

Active transport improvements include a wider path for pedestrians, bike riders and mobility device users on the southern side of the new bridge with active transport paths connecting to Bli Bli village and Muller Park.

The proposed planning layout includes the ability to convert the bridge to four lanes should traffic demands require this in the future.

The Queensland Government remains committed to maintaining the existing Bli Bli bridge to allow continued safe operation for all users.

Regular inspections are conducted as part of the structures maintenance program to monitor its condition and enable any necessary repairs.

Planning has been completed and the project is now closed.

Timeframes for future stages are unknown and will depend on future funding commitments and competing statewide priorities.

Project priorities and funding needs are reviewed and re-evaluated regularly by the department to ensure that as many positive road outcomes as possible are obtained within a finite budget.

  • North Coast District
  • Planning
Aerial view of Bli Bli Bridge

Maroochydore Road, Pike Street and Killick Street intersection upgrade, design

The department has identified a preferred option for the future upgrade of Maroochydore Road, Kunda Park to improve the existing transport network by enhancing network reliability and improving access options.

  • North Coast District
  • Pre-construction
No image supplied

Maroochydore–Noosa Road Route Strategy and Link Plan

The department is undertaking planning for the full length of Maroochydore–Noosa Road which runs from Ocean Street, Maroochydore to Emu Mountain Road, Peregian Springs.

  • North Coast District
  • Planning
No image supplied

Mooloolaba Road, Syd Lingard Drive to Tantula Road West, upgrade intersections

Construction has started on the Mooloolaba Road, Syd Lingard Drive to Tantula Road West intersections upgrade project. This project is designed to improve traffic flow and reduce delays, congestion, and queuing in this busy area.

  • North Coast District
  • Construction
No image supplied

Mooloolaba to Maroochydore cycleway, design cycleway

The department is partnering with Sunshine Coast Council to deliver the Mooloolaba to Maroochydore cycleway which will provide a bicycle path connecting Mooloolaba to Maroochydore.

  • North Coast District
  • Detailed design
Map showing the proposed alignment for Mooloolaba to Maroochydore Cycleway

Mooloolah River Interchange Upgrade (Stage 1)

The Mooloolah River Interchange Upgrade project will address long-standing safety and congestion issues on the Sunshine Motorway, with the Sunshine Coast experiencing rapid population growth and development.

This project is critical to improving north-south road connectivity and is a key component of The Wave – a broader plan to deliver generational infrastructure for the region.

  • North Coast District
  • Construction

Mossman – Daintree Road, 2024 Disaster Recovery Funding Arrangements reconstruction works

Reconstruction works are underway on a section of Mossman – Daintree Road damaged during ex-Tropical Cyclone Jasper.

Disaster recovery is a long-term process and involves an extensive program of works and complex solutions.

A variety of stabilising techniques will be used, including:

  • reinforcing the slopes
  • soil anchoring systems
  • vertical retention piling
  • building rock retaining walls.

These repairs will ensure the road is returned to its fully operational pre-cyclone function.

  • Far North District
  • Construction
No image supplied

Mossman – Mount Molloy Road, 2024 Disaster Recovery Funding Arrangements reconstruction works

Reconstruction works on Mossman – Mount Molloy Road are underway to repair landslip sites caused by ex-Tropical Cyclone Jasper in December 2023.

  • Far North District
  • Construction
No image supplied

Mount Spec Road reconstruction works

The Queensland Government is repairing Mount Spec Road after substantial structural damage following record rainfall in early 2025. This includes more than 60 landslips, with 6 major and 2 high-risk sites.

  • Northern District
  • Construction
No image supplied

Narangba station park ‘n’ ride expansion

The Queensland Government is expanding the parking facilities at Narangba train station.

  • North Coast District
  • Construction
No image supplied

Next Generation Traffic Signalling Program

The Next Generation Traffic Signalling Program is an initiative aimed at transforming traffic signal infrastructure across Queensland.

  • Central West District
  • Darling Downs District
  • Far North District
  • Fitzroy District
  • Mackay Whitsunday District
  • Metropolitan District
  • North Coast District
  • North West Direct
  • Northern District
  • South Coast District
  • South West District
  • Wide Bay Burnett District
  • Construction
No image supplied

Nicklin Way, Third Avenue extension, new intersection

The Queensland Government, in partnership with Sunshine Coast Council, has finalised design for the Caloundra Transport Corridor Upgrade, including the Nicklin Way, Third Avenue extension.

  • North Coast District
  • Procurement
Nicklin Way looking south towards Caloundra at the location where Third Avenue will connect 1

North Coast Line Stabling Expansion

We are working with Queensland Rail to expand train stabling facilities across the rail network. Stabling yards are used to park trains when they are not in use.

  • North Coast District
  • Planning
No image supplied

Northern Sunshine Coast Public Transport Strategy

The department is working towards an improved public transport system for the Sunshine Coast.

  • North Coast District
  • Planning
No image supplied

Road Asset Management Contracts—North Coast

In April 2024, Fulton Hogan was awarded a 5-year contract to provide routine and programmed maintenance services across North Coast Region.

  • North Coast District
  • Commissioning
No image supplied

Samford Road safety improvements

The safety improvement project along Samford Road, covering a 1.5 km section between the Lomandra Access Road picnic area and Camp Mountain Road, inclusive of the intersection at Camp Mountain Road, is now complete.

  • North Coast District
  • Completed
No image supplied

Scarborough State Boat Harbour Master Plan

Scarborough State Boat Harbour is a vibrant part of the Redcliffe Peninsula community. The Harbour hosts dry standings and wet berths, as well as two public boat ramps, offering boating and cruising yacht facilities of particular significance for Australia's eastern seaboard.

  • North Coast District
  • Planning
Aerial view of Scarborough Harbour

Southern Queensland 2022 flood reconstruction works completed

Repairs have been completed across southern Queensland after extensive and severe damage to the state-controlled road network was caused by multiple heavy rainfall and flooding events in 2022.

  • Darling Downs District
  • Metropolitan District
  • North Coast District
  • South Coast District
  • Wide Bay Burnett District
  • Completed
Landslip on Gold Coast - Springbrook Road

Southern Sunshine Coast Roads Improvement Study

Planning to identify and prioritise road network connectivity and safety improvements to increase road capacity within the growing southern Sunshine Coast area is now complete.

  • North Coast District
  • Planning
No image supplied

Strathpine - Samford Road (Eatons Crossing Road and Mount Samson Road), improve intersection and route safety

Construction is complete for safety improvements on Strathpine-Samford Road between Eatons Hill and Samford Valley.

  • North Coast District
  • Completed
No image supplied

Sunshine Coast public transport, business case

The department undertook a detailed business case for an improved public transport system for the Sunshine Coast.

  • North Coast District
  • Planning
No image supplied

Sunshine Motorway (Mooloolaba - Peregian), David Low Way to Yandina - Coolum Road, duplication, planning

The Queensland Government is planning to duplicate the Sunshine Motorway between David Low Way to just north of Yandina-Coolum Road.

  • North Coast District
  • Planning
No image supplied

Sunshine Motorway (Mooloolaba - Peregian), West Coolum Road, upgrade interchange

The Queensland Government is planning two new south-facing motorway ramps at West Coolum Road, Mount Coolum as part of a broader staged approach to upgrading the Sunshine Motorway.

  • North Coast District
  • Planning
No image supplied

Sunshine Motorway (Mooloolah River to Maroochy River) planning

The department is planning to improve efficiency, capacity and safety on the Sunshine Motorway between the Mooloolah River and the Maroochy River.

  • North Coast District
  • Planning
No image supplied

Sunshine Motorway (Tanawha – Mooloolaba), Dixon Road to Mooloolah River Interchange, business case

The department is planning to improve a section of the Sunshine Motorway between Dixon Road, Buderim and the Mooloolah River Interchange.

  • North Coast District
  • Planning
No image supplied

Tewantin Bypass, Beckmans Road, planning

Planning is underway for a long-term, staged solution to improve safety and traffic flow between Cooroy-Noosa Road and Eumundi-Noosa Road within the Beckmans Road corridor.

  • North Coast District
  • Planning
No image supplied

The Wave Stage 3 (Metro)

The Wave Stage 3 (Metro) will improve travel across the Sunshine Coast by delivering a high-capacity, high-frequency service from Birtinya to the Sunshine Coast Airport.

  • North Coast District
  • Planning
Artist’s impression of the future Birtinya Station, featuring a turquoise metro bus on the right, with people walking and cycling on the left, and the station building visible in the background.

The Wave – Stages 1 and 2 (Rail) (previously Direct Sunshine Coast Rail Line)

We’re directly connecting the eastern communities of the Sunshine Coast to South East Queensland’s passenger rail network, making it easier to travel locally, and to and from the Sunshine Coast.

  • North Coast District
  • Pre-construction
No image supplied

Yandina—Coolum Road, South Coolum Road and School Road, upgrade roundabout

Construction for a project to replace the roundabout with a signalised intersection has been completed.

  • North Coast District
  • Completed
No image supplied