Showing results 1-5 of 5

Sort results
Sort results
  1. Coomera Connector Stage 1 South

    Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 South, currently in the design phase, is the section from Smith Street Motorway to Nerang-...

    No image supplied
  2. Coomera Connector Stage 1 Central

    Coomera Connector (Stage 1) is around 16km long and will be delivered in 3 construction packages. Stage 1 Central, which is currently in the design phase, is the 8km section from Helensvale Road to...

    No image supplied
  3. Coomera Connector (Stage 1)

    The Coomera Connector is a future state-controlled north-south corridor between Loganholme and Nerang, east of the Pacific Motorway (M1)...

    Artist's impression of a road crossing a river
  4. Coomera Connector (Future stages) Loganholme to Coomera, planning

    Planning is now underway for future stages of the Coomera Connector - the remaining 29kms between Loganholme and Coomera...

    Coomera Connector Future stages Foxwell street - October 2023
  5. Coomera Connector Stage 1 North

    Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 North, which is currently under construction, is the 4km section from Shipper Drive to Helensvale...

    No image supplied