Coomera Connector Stage 1 South
Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 South, currently in the design phase, is the section from Smith Street Motorway to Nerang-...
Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 South, currently in the design phase, is the section from Smith Street Motorway to Nerang-...
Planning is now underway for future stages of the Coomera Connector - the remaining 29kms between Loganholme and Coomera...
The Coomera Connector is a future state-controlled north-south corridor between Loganholme and Nerang, east of the Pacific Motorway (M1)...
Coomera Connector (Stage 1) is around 16km long and will be delivered in 3 construction packages. Stage 1 Central, which is currently in the design phase, is the 8km section from Helensvale Road to...
Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 North, which is currently under construction, is the 4km section from Shipper Drive to Helensvale...