Showing results 1-10 of 35

Sort results
Sort results
  1. Isisford-Blackall Road, pavement rehabilitation

    Works are underway to progressively rehabilitate about 26km of high priority sections of the Isisford - Blackall Road with completion expected in mid-2022...

    No image supplied
  2. Long-distance passenger rail business case

    We are preparing a business case to replace the rollingstock on the long distance passenger rail fleet that services western regional Queensland...

    No image supplied
  3. Eyre Developmental Road (Bedourie - Birdsville), pave and seal

    Around 35km of the 185km road is being sealed to improve safety, connectivity and wet weather access...

    No image supplied
  4. Peak Downs Highway (Clermont - Nebo), Wuthung Road to Caval Ridge Mine, widen and strengthen pavement

    The Peak Downs Highway Wuthung to Caval Ridge project strengthened and widened a 14-km section of highway from Wuthung Road to the Caval Ridge mine turnoff...

    Clearmont Nebo Project map
  5. Cramsie-Muttaburra Road, rehabilitate and widen pavement

    This project will widen and rehabilitate a 3km section of aged, narrow pavement on the Cramsie-Muttaburra Road to a width of 8m, improving safety, overtaking opportunities and travel times...

    The map shows the location of rehabilitation and widening works underway on a three kilometre section of the Cramsie-Muttaburra Road. The road is situated between Longreach and Muttaburra in Central West Queensland. The map shows the proximity of the works to the Longreach township and includes the surrounding road network, such as the Landsborough Highway and local government-owned Longreach-Muttaburra Road.
  6. Mackay – Bucasia Road, capacity upgrades and duplication planning

    Planning is underway to identify potential future upgrades to Mackay – Bucasia Road to improve congestion, safety, and flooding impacts on this vital link to the Northern Beaches...

    No image supplied
  7. Proserpine - Shute Harbour Road, Paluma Road to Tropic Road (Cannonvale), duplication

    This upgrade will improve safety and increase capacity along a 1.5-km section of Proserpine - Shute Harbour Road by widening from 2 to 4 lanes, upgrading key intersections, and installing a new shared...

    No image supplied
  8. Walkerston Bypass

    We are building a new 2-lane rural highway to connect Peak Downs Highway west of Walkerston to the Mackay Ring Road near Paget...

    Walkerston Bypass map detail several upgrades
  9. Bruce Highway (Mackay - Proserpine), Jumper Creek, upgrade flood immunity

    Flood immunity on the Bruce Highway at Jumper Creek, north of Mackay is being upgraded to improve the safety and reliability of this section of the highway and minimise disruption through flood...

    No image supplied
  10. Proserpine – Shute Harbour Road, Hamilton Plains, flood immunity upgrade

    Proserpine – Shute Harbour Road will benefit from a $21 million flood immunity upgrade at Hamilton Plains between the Bruce Highway turn-off and Strathdickie Road...

Previous Page (disabled)
  1. Page 1
  2. Page 2
  3. Page 3
  4. Page 4