Cramsie–Muttaburra Road, pave and seal
This project will seal almost 9km of a gravel section of the Cramsie-Muttaburra Road...
This project will seal almost 9km of a gravel section of the Cramsie-Muttaburra Road...
The Blackall-Jericho Road is now fully sealed following the completion of a progressive program of works to upgrade this key strategic link...
The project involves paving and sealing another 6.7km of road to improve safety and travel times on this key transport link...
About 20km of the Barcaldine-Aramac Road has been gradually widened to improve travelling conditions...
Works are underway to replace the existing timber Barcoo River Bridge near Tambo with a wider, higher, modern concrete structure...
Around 35km of the 185km road is being sealed to improve safety, connectivity and wet weather access...
Works are underway to widen 3 high priority sections of the Capricorn Highway between Emerald and Alpha...
We are reconnecting communities and supporting regional economic recovery after disaster events damaged the state-controlled road network in 2020, 2021 and 2022...
We are improving the flood immunity and resilience of the state-controlled road network at 10 key sites...